Permit Information
Permit NumberBLD03-01888
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMicron Building 3
Customer Number5709
ePlanReviewNo
Description
Micron Building #3 - F1 Remodel For ASML 850 SCN 2G2 * (PCS #20035709) - To demo. clean room partitions and doors between Photo Bays #101D, #101E, #101F, Plenum #308 & Plenum #317. To saw cut an approximate 265 sq. ft. area of the existing concrete slab floor and excavate a 42 inch deep hole. To construct concrete retaining walls, new concrete slab and access floor system at that area. To add new clean room partitions and doors to reconfigure Plenum #308, shorten Plenum #317 and combine Photo Bay areas #101D, #101E & #101F. This work also include installing some additional clean room ceiling, installing new 2" industrial waste line and misc. exhaust, mechanical, process piping, electrical work, fire alarm and fire sprinkler work. This work is being done in an approximate 700 square foot area of the first floor of Building #3 between grid lines 6&8 and F&G. All construction per the approved plans and attached comment list. PC#465-03/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/22/20041/22/20041/22/2004APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/22/2004 at 7:04:07 AM. Contact: ###-####. ok for l/c 1/22/2004 12:00:18 PM
FIRE-Final Inspection1/8/20041/8/20041/8/2004PPASS
DetailsRick Jackson
BLD-Footing10/21/200310/23/200310/23/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/21/2003 at 12:40:54 PM. Contact: ###-####. placed with special insp. 10/23/2003 9:18:44 AM
BLD-Footing10/21/200310/22/200310/22/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/21/2003 at 12:40:07 PM. Contact: ###-####. wip special insp on site. 10/22/2003 8:16:29 AM
BLD-Footing10/17/200310/21/200310/21/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/17/2003 at 7:53:37 AM. Contact: ###-####. wip 10/21/2003 9:44:50 AM
BLD-Footing10/17/200310/20/200310/20/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/17/2003 at 7:52:55 AM. Contact: ###-####. wip covered with special insp. 10/20/2003 10:24:09 AM
BLD-Footing10/17/200310/17/200310/17/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/17/2003 at 7:52:12 AM. Contact: ###-####.out of time. 10/20/2003 8:05:35 AM