FIRE-Final Inspection | 4/8/2004 | 4/9/2004 | 4/9/2004 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 4/9/2004 9:37:37 AM
|
Permanent Occupancy | | 4/9/2004 | 4/9/2004 | | DONE |
|
|
|
|
BLD-Final | 12/23/2003 | 12/24/2003 | 12/24/2003 | A | PART |
Jim Sly
|
|
|
Dennis; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes OK for Temp Occ. C/N..... Obtain Perm Occ. status within 90 days of this notice. OK for Temp. Providing the sprinkler system is operating properly throughout the entire Bldg Per Troy Cobbley and Dave Miller. OK for Perm Occ. for Structural, after Fire life/Safety OK for Perm. 12/24/2003 11:30:27 AM
|
FIRE-Final Inspection | 12/18/2003 | 12/19/2003 | 12/19/2003 | A | FAIL |
Troy Cobbley
|
|
|
still need to install insulation above the upright sprinkler heads in the empty tenant spaces 12/19/2003 12:08:41 PM
|
FIRE-Final Inspection | 12/19/2003 | 12/19/2003 | 12/19/2003 | P | PART |
Troy Cobbley
|
|
|
Temp occupancy given until the fire alarm and fire sprinkler for the shell is finaled 12/19/2003 3:29:24 PM
|
BLD-Final | 12/16/2003 | 12/17/2003 | 12/17/2003 | P | FAIL |
Jim Sly
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Need all Req signatures. 12/17/2003 3:34:28 PM
|
FIRE-Final Inspection | 12/16/2003 | 12/17/2003 | 12/17/2003 | A | FAIL |
Troy Cobbley
|
|
|
Inspection turned into a conference on the life safety notes. The contractor was not ready for an inspection. 12/17/2003 10:31:29 AM
|
BLD-Framing/Rough-in | 12/2/2003 | 12/3/2003 | 12/3/2003 | A | PASS |
Jim Sly
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 12/3/2003 8:35:18 AM
|