Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD03-02169
StatusFinaled
Name THE CHURRO WORKS
Site Address 350 N MILWAUKEE ST Unit: 2074
Project NameBTS - #2074
Customer Number 
ePlanReviewNo
Description
(THE CHURRO WORKS)(BOISE TOWNE SQUARE-SPACE 2074) To remodel a 490 sq.ft. food prep and sales tenant on the upper level of the mall per approved plans, Work will include construction of interior noncombustible partitions to create accessible restrooms, wall to separate the kitchen area from the storage area, installation of new accessible front service counter, installation of new type 1 hood system and grease duct shaft (Fire master Duct wrap), Installation of new storefront and roll down security grill miscelaneous related kitchen equipment and interior finishs. This building is fully fire sprinklered for mall provisions and contains a smoke evacuation system, the smoke evacuation system must remain operational as installed under the 1985 UBC. Any alterations to the fire sprinkler system shall be per NFPA #13 as regulated by the building department. (pc#539-03) rmh
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/18/200311/19/200311/19/2003APASS
DetailsJim Sly
OK for Perm Occ. :) 11/19/2003 8:54:20 AM
Permanent Occupancy 11/19/200311/19/2003 DONE
Details
BLD-Final11/18/200311/18/200311/18/2003PNR
DetailsSteven Webb
###-#### john Discussed with permitee, needs additions sign off per R. Jackson. 11/18/2003 2:43:38 PM
FIRE-Final Inspection11/18/200311/18/200311/18/2003PFAIL
DetailsRick Jackson
fire alarm/extinguishing system okay; still need air balance report new Type I exhaust fan/make-up system for final 11/18/2003 2:09:11 PM
FIRE-Final Inspection11/18/200311/18/200311/18/2003PPASS
DetailsRick Jackson
received air balance report - pass 11/18/2003 4:17:02 PM
BLD-Framing/Rough-in11/14/200311/17/200311/17/2003APASS
DetailsJim Sly
John --- grid inspection; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Grid and support of beam ...OK 11/17/2003 8:46:42 AM
FIRE-Conference11/13/200311/13/200311/13/2003PPART
DetailsTroy Cobbley
I stopped at the project to perform a sprinkler rough-in inspection and found the hood suppression system partially installed without a permit issued. I had Darla put a hold on the permit that he finally did pull until the double permit fee is paid.
BLD-Framing/Rough-in10/21/200310/22/200310/22/2003PPART
DetailsRuss Owen
John; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Ok to cover walls , I have asked contractor to call for a ceiling grid inspection. And at that time I would like to see a center support for the interior side of the box beam that will meet with the ceiling grid. 10/21/2003 11:17:20 PM