BLD-Final | 11/18/2003 | 11/19/2003 | 11/19/2003 | A | PASS |
Jim Sly
|
|
|
OK for Perm Occ. :) 11/19/2003 8:54:20 AM
|
Permanent Occupancy | | 11/19/2003 | 11/19/2003 | | DONE |
|
|
|
|
BLD-Final | 11/18/2003 | 11/18/2003 | 11/18/2003 | P | NR |
Steven Webb
|
|
|
###-#### john Discussed with permitee, needs additions sign off per R. Jackson. 11/18/2003 2:43:38 PM
|
FIRE-Final Inspection | 11/18/2003 | 11/18/2003 | 11/18/2003 | P | FAIL |
Rick Jackson
|
|
|
fire alarm/extinguishing system okay; still need air balance report new Type I exhaust fan/make-up system for final 11/18/2003 2:09:11 PM
|
FIRE-Final Inspection | 11/18/2003 | 11/18/2003 | 11/18/2003 | P | PASS |
Rick Jackson
|
|
|
received air balance report - pass 11/18/2003 4:17:02 PM
|
BLD-Framing/Rough-in | 11/14/2003 | 11/17/2003 | 11/17/2003 | A | PASS |
Jim Sly
|
|
|
John --- grid inspection; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Grid and support of beam ...OK 11/17/2003 8:46:42 AM
|
FIRE-Conference | 11/13/2003 | 11/13/2003 | 11/13/2003 | P | PART |
Troy Cobbley
|
|
|
I stopped at the project to perform a sprinkler rough-in inspection and found the hood suppression system partially installed without a permit issued. I had Darla put a hold on the permit that he finally did pull until the double permit fee is paid.
|
BLD-Framing/Rough-in | 10/21/2003 | 10/22/2003 | 10/22/2003 | P | PART |
Russ Owen
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Ok to cover walls , I have asked contractor to call for a ceiling grid inspection. And at that time I would like to see a center support for the interior side of the box beam that will meet with the ceiling grid. 10/21/2003 11:17:20 PM
|