Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-02198
StatusFinaled
Name KITTELSON & ASSOCIATES
Site Address 101 S CAPITOL BLVD Unit: 301
Project NameUS BANK-3RD FLR
Customer Number 
ePlanReviewNo
Description
(KITTELSON & ASSOCIATES - SUITE 301) This building is fire sprinklered because it is a high-rise. To create a 2,956 square foot office tenant space and to construct interior improvements. This space is located on the 3rd floor (14,600 square feet total) of an existing high rise building. The "core" has a floor area of 2,670 square feet. In addition to tenant improvement work, the two existing "core" restrooms will be upgraded to be accessible to the disabled and the elevator lobby remodeled under this permit. Work is to include interior nonbearing walls, interior windows and doors, millwork, finishes, and suspended ceilings all per the approved drawings and the plan review report on file. The fire sprinkler system, fire alarm system, and high-rise life safety systems (and the infrastructure supporting these systems) for the 3rd floor are regulated under the provisions of the 2000 IBC. The fire sprinkler system on the 3rd floor shall comply with NFPA 13-1999 as regulated by the Fire Department. If not already existing, firesafing shall be installed at the perimeter of the floor (within this tenant space) between the floor and the spandrel glass. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection1/6/20061/6/20061/6/2006 PASS
DetailsDave Hannah
DOC - Permit Expired1/6/20061/6/20061/6/2006PPASS
DetailsDave Hannah
BLD-Aging Inspection10/11/200510/11/200510/14/2005 PASS
DetailsDave Hannah
BLD-Final10/13/200510/13/200510/14/2005PPASS
DetailsDave Hannah
ok for perm occ
Permanent Occupancy 10/14/200510/14/2005 DONE
Details
BLD-Aging Inspection8/2/20048/2/20048/2/2004 PASS
DetailsDave Hannah
BLD-Aging Inspection8/2/20048/2/20048/2/2004 PASS
DetailsDave Hannah
BLD-Final2/4/20042/5/20042/5/2004ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/4/2004 at 1:50:32 PM. Contact: ###-####.
BLD-Framing/Rough-in2/3/20042/4/20042/4/2004APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/3/2004 at 1:27:13 PM. Contact: ###-####. cieling grid ok nto cover 2/4/2004 2:26:42 PM
FIRE-Final Inspection2/4/20042/4/20042/4/2004PPASS
DetailsRick Jackson
BLD-Framing/Rough-in1/29/20041/30/20041/30/2004AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/29/2004 at 1:19:04 PM. Contact: ###-####. ceiling grid 1/30/2004 10:32:31 AM
BLD-Framing/Rough-in1/13/20041/14/20041/14/2004APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/13/2004 at 12:50:49 PM. Contact: ###-####.bath rooms and elev lobby ok to cover 1/14/2004 10:03:35 AM
BLD-Framing/Rough-in12/24/200312/24/200312/24/2003PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/24/2003 at 7:49:23 AM. Contact: ###-####. ok to cover office infill walls 12/24/2003 2:02:43 PM