BLD-Final | 1/22/2004 | 1/23/2004 | 1/23/2004 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 1/22/2004 at 10:08:43 AM. Contact: ###-####.
|
FIRE-Final Inspection | 1/22/2004 | 1/23/2004 | 1/23/2004 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 1/22/2004 at 10:07:56 AM. Contact: ###-####.
|
BLD-Final | 1/20/2004 | 1/21/2004 | 1/21/2004 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/20/2004 at 10:48:49 AM. Contact: ###-####.--cancel per floyd
|
FIRE-Final Inspection | 1/20/2004 | 1/21/2004 | 1/21/2004 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 1/20/2004 at 10:48:01 AM. Contact: ###-####. need exit sign at north exit and emergency lighting for both exits; extinguisher 1/21/2004 8:45:41 AM
|
BLD-Framing/Rough-in | 12/8/2003 | 12/9/2003 | 12/9/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/8/2003 at 4:22:36 PM. Contact: ###-####. ok to cover after other trades sign off 12/9/2003 2:43:38 PM
|
BLD-Framing/Rough-in | 10/29/2003 | 10/30/2003 | 10/30/2003 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/29/2003 at 10:01:28 AM. Contact: ###-####. 7 ft header ok to cover mti did spec on cmu cut out 10/30/2003 2:49:35 PM
|