BLD-Final | 3/18/2004 | 3/19/2004 | 3/19/2004 | A | PASS |
Troy James
|
|
|
Brian -- call first for access.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Final | 3/1/2004 | 3/1/2004 | 3/1/2004 | P | FAIL |
Troy James
|
|
|
please call for access information//brian; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Seal access door to attic and install bollard each side of gas meter at fire lane. 3/1/2004 2:53:01 PM
|
BLD-Energy code compliance | 12/12/2003 | 12/15/2003 | 12/15/2003 | P | PASS |
Troy James
|
|
|
RYAN; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 12/12/2003 | 12/12/2003 | 12/12/2003 | P | PART |
Jim Storey
|
|
|
RYAN; Phone #: ###-#### Internet Inspection Request from: Darla Downs 12/12/2003 3:57:34 Pm brace a2 trusses/support floor joist at stair/ beam or header for cantalever. 12/12/2003 3:58:35 PM
|
BLD-Framing/Rough-in | 12/11/2003 | 12/11/2003 | 12/11/2003 | P | FAIL |
Troy James
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
c/n no truss calcs on site 12/11/2003 2:18:56 PM
|
BLD-Framing/Rough-in | 11/24/2003 | 11/25/2003 | 11/25/2003 | A | NR |
Jim Storey
|
|
|
Brian; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ele failled. 11/25/2003 10:07:51 AM
|
BLD-Foundation | 10/21/2003 | 10/22/2003 | 10/22/2003 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/21/2003 at 7:32:47 PM. Contact: ###-####. pw/oi 10/22/2003 4:41:43 PM
|
BLD-Footing | 10/20/2003 | 10/21/2003 | 10/21/2003 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/20/2003 at 12:46:14 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Oct 21 2003 6:26AM.
|
BLD-Footing | 10/21/2003 | 10/21/2003 | 10/21/2003 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/21/2003 at 6:28:25 AM. Contact: ###-####.forms all most complet.wip 10/21/2003 3:50:35 PM
|