BLD-Aging Inspection | 6/8/2006 | 6/8/2006 | 6/8/2006 | | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 6/8/2006 | 6/8/2006 | 6/8/2006 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 4/5/2006 | 4/5/2006 | 4/5/2006 | | CANC |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 4/5/2006 | 4/5/2006 | 4/5/2006 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 9/3/2004 | 9/7/2004 | 9/7/2004 | A | PASS |
Lane Manuel
|
|
|
jamie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
all conditions have been met for letter of compliance/ c of o, whichever is applicable. 9/7/2004 11:46:42 AM
|
FIRE-Final Inspection | 9/3/2004 | 9/3/2004 | 9/3/2004 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 9/3/2004 2:30:34 PM
|
BLD-Framing/Rough-in | 3/15/2004 | 3/15/2004 | 3/15/2004 | P | PASS |
Jim Sly
|
|
|
Jamie -- would like as close to noon as possible. thanks.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 3/15/2004 12:37:25 PM 2-1 fitting room OK. 3/15/2004 12:37:56 PM
|
BLD-Framing/Rough-in | 3/11/2004 | 3/12/2004 | 3/12/2004 | P | PART |
Russ Owen
|
|
|
Jamie; Phone #: ###-#### hard lid celiling, it's been re-engineered. Internet Inspection Request from: Aimee Hughes The architect has requested strong backs above the grid, to add addnl support to drywall, they have added them, no specific detail but letter head wording the strong backs ,3 round ceilings at lower floor, 1-2 ,1-3 are ok to drywall. there is 1 more at the 2nd floor not yet ready. 3/11/2004 11:15:39 PM
|
BLD-Framing/Rough-in | 3/10/2004 | 3/10/2004 | 3/10/2004 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/10/2004 at 6:43:51 AM. Contact: ###-####. 3/10/2004 9:05:20 AM 2nd phase walls only OK. 3/10/2004 12:33:12 PM
|
BLD-Framing/Rough-in | 3/8/2004 | 3/8/2004 | 3/8/2004 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 3/8/2004 at 9:53:15 AM. Contact: ###-####. low walls 3/7/2004 11:50:35 PM
|
FIRE-Final Inspection | 3/4/2004 | 3/4/2004 | 3/4/2004 | P | PART |
Troy Cobbley
|
|
|
Phase 1 is ok to occupy 3/4/2004 2:25:11 PM
|
BLD-Other | 2/27/2004 | 2/27/2004 | 2/27/2004 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/27/2004 at 10:30:35 AM. Contact: ###-####. Grid OK per appr plan. 2/27/2004 1:43:31 PM
|
BLD-Framing/Rough-in | 2/18/2004 | 2/18/2004 | 2/18/2004 | P | DONE |
Russ Owen
|
|
|
ACT grid --- ###-#### Jayme. New grid requires more wires and electrical inspection,recall when this is done contractors on site. 2/18/2004 12:34:47 AM
|
BLD-Framing/Rough-in | 2/3/2004 | 2/4/2004 | 2/4/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/3/2004 at 3:50:29 PM. Contact: ###-####. 2/4/2004 11:51:36 AM Phase I frame OK. 2/4/2004 12:21:33 PM
|