BLD-Final | 3/18/2014 | 3/18/2014 | 3/18/2014 | A | DONE |
Jim Sly
|
|
|
EXP.
|
DOC - Permit Expired | 3/18/2014 | 3/18/2014 | 3/18/2014 | P | PASS |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 3/18/2014 | 3/18/2014 | 3/18/2014 | | CANC |
Jim Sly
|
|
|
|
BLD-Conference | 3/20/2012 | 3/20/2012 | 3/20/2012 | P | PASS |
Jim Sly
|
|
|
Scott Phone #: ###-#### WIP
|
BLD-Conference | 9/1/2011 | 9/1/2011 | 9/1/2011 | P | DONE |
Jim Sly
|
|
|
Met with Scott.....Most of the painting and tile complete...Needs to finish and set 2 furnaces. Needs to obtain all finals and then obtain bldg final. He says 2-3 months. Scott cgh-gdgb
|
BLD-Aging Inspection | 7/12/2011 | 7/12/2011 | 7/18/2011 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 4/11/2011 | 4/11/2011 | 4/18/2011 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Conference | 9/20/2010 | 9/20/2010 | 9/20/2010 | P | DONE |
Jim Sly
|
|
|
Scott Phone #: ###-#### Met with Scott......Walked through entire house. Scott is doing all tile and finish work and this is a very large house. Approx. 1/2 of the finish work and tile have been completed. No interior painting has been done yet. Slow.....but work in progress.
|
BLD-Final | 9/16/2010 | 9/17/2010 | 9/17/2010 | A | NH |
Jim Sly
|
|
|
Scott ###-#### Called left mssg.
|
BLD-Final | 9/16/2010 | 9/16/2010 | 9/16/2010 | P | NH |
Jim Sly
|
|
|
Scott phone ###-#### Called and left V/M
|
BLD-Aging Inspection | 9/15/2010 | 9/15/2010 | 9/16/2010 | | CANC |
Jim Sly
|
|
|
|
BLD-Conference | 4/19/2010 | 4/19/2010 | 4/19/2010 | P | PASS |
Jim Sly
|
|
|
Scott Phone #: ###-#### Work in progress.....Tile flooring.
|
BLD-Final | 1/8/2010 | 1/11/2010 | 1/11/2010 | A | PEND |
Jim Sly
|
|
|
Scott called and said he is still trying to finish....WIP
|
BLD-Conference | 10/26/2009 | 10/27/2009 | 10/27/2009 | A | CANC |
Jim Sly
|
|
|
Scott ###-####
|
BLD-Conference | 10/26/2009 | 10/26/2009 | 10/27/2009 | P | DONE |
Jim Sly
|
|
|
Scott Phone #: ###-#### Scott (homeowner) still working on Tile and finish work....slow progress ....WIP.
|
BLD-Conference | 4/30/2009 | 5/4/2009 | 5/4/2009 | P | PASS |
Dave Hannah
|
|
|
Scott Phone #: ###-####work in progress
|
BLD-Conference | 10/14/2008 | 10/14/2008 | 10/14/2008 | P | DONE |
Jim Sly
|
|
|
Scott Phone #: ###-#### WIP
|
BLD-Conference | 10/13/2008 | 10/13/2008 | 10/13/2008 | A | DONE |
Jim Sly
|
|
|
Jim, Public Works is wonering what is going on with this permit . Please do a conference to see what is what . Thanks Darla No one home......appears to be still working....(finish Work)....Called Darla WIP
|
BLD-Conference | 4/17/2008 | 4/17/2008 | 4/17/2008 | P | CANC |
Jim Sly
|
|
|
scott Phone #: ###-#### WIP
|
BLD-Conference | 11/14/2007 | 11/14/2007 | 11/14/2007 | P | DONE |
Jim Sly
|
|
|
scott Phone #: ###-#### Work in progress
|
BLD-Other | 5/23/2007 | 5/23/2007 | 5/25/2007 | P | DONE |
Jim Sly
|
|
|
Noi inspections in over a year but permit has not expired??? Sewer Rating is wondering the status of this project.....Thanks Barb ###-#### ext 5822 Called owner.....Still working on house.....Starting to trim out. WIP. Called Barb and left message.
|
BLD-Energy code compliance | 4/14/2006 | 4/14/2006 | 4/14/2006 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/14/2006 at 7:02:27 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/23/2006 | 2/23/2006 | 2/23/2006 | P | PASS |
Jim Sly
|
|
|
Scott; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Conference | 9/23/2005 | 9/23/2005 | 9/23/2005 | P | PASS |
Jim Sly
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Placement of smokes
|
BLD-Framing/Rough-in | 1/7/2005 | 1/10/2005 | 1/10/2005 | P | PART |
Jim Sly
|
|
|
SCOTT-GARAGE ONLY; Phone #: ###-#### Internet Inspection Request from: Jan Rice Trusses, wall framing and insulation OK in Garage only. 1/10/2005 1:52:55 PM
|
BLD-Conference | 9/27/2004 | 9/27/2004 | 9/27/2004 | P | PASS |
Jim Sly
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Conference | 9/10/2004 | 9/13/2004 | 9/13/2004 | P | PASS |
Jim Sly
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Conference | 8/16/2004 | 8/17/2004 | 8/17/2004 | A | DONE |
Jim Sly
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD - Request for Extension | 4/20/2004 | 4/20/2004 | 4/20/2004 | | DONE |
Jim Sly
|
|
|
###-#### scott still working on structure WIP 4/23/2004 4:27:12 PM
|
BLD-Foundation | 11/17/2003 | 11/18/2003 | 11/18/2003 | A | PASS |
Jim Sly
|
|
|
Cal; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Footing | 11/14/2003 | 11/17/2003 | 11/17/2003 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/14/2003 at 12:16:05 PM. Contact: ###-####. Footings for house (crawl) area and Garage.....OK. 11/17/2003 9:03:41 AM
|
BLD-Foundation | 11/5/2003 | 11/5/2003 | 11/5/2003 | P | PART |
Jim Sly
|
|
|
EASON ; Phone #: ###-#### Internet Inspection Request from: Annette Moore Bsmnt walls OK 11/5/2003 2:37:56 PM
|
BLD-Footing | 10/31/2003 | 11/3/2003 | 11/3/2003 | A | PASS |
Jim Sly
|
|
|
BOB; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Fairview....N on Bryson By Garden center west.......Go all the way to end... take left Behind tan brick house on corner (flag lot) 11/3/2003 10:37:20 AM
|