BLD-Final | 7/13/2004 | 7/13/2004 | 7/13/2004 | P | PASS |
Dave Hannah
|
|
|
rock; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok fo c.c 7/13/2004 5:58:52 PM
|
BLD-Final | 7/12/2004 | 7/12/2004 | 7/12/2004 | P | CANC |
Dave Hannah
|
|
|
rock; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Final Inspection | 7/9/2004 | 7/9/2004 | 7/9/2004 | P | PASS |
Rick Jackson
|
|
|
|
BLD-Framing/Rough-in | 7/6/2004 | 7/7/2004 | 7/7/2004 | A | PART |
Dave Hannah
|
|
|
Rock -- grid ; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok to drop in ceiling ride pn 2 7/7/2004 11:07:56 AM
|
BLD-Final | 4/7/2004 | 4/8/2004 | 4/8/2004 | A | PART |
Dave Hannah
|
|
|
rock; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to occ phase one 4/8/2004 1:12:18 PM
|
FIRE-Final Inspection | 4/6/2004 | 4/6/2004 | 4/6/2004 | P | PART |
Rick Jackson
|
|
|
SLRMC is phasing this permit; okay to occupy except rooms 202/203/205/206/208 and hallway 004; the fire alarms have been approved for this phase 4/6/2004 2:16:25 PM
|
BLD-Framing/Rough-in | 3/18/2004 | 3/19/2004 | 3/19/2004 | A | PART |
Dave Hannah
|
|
|
ceiling grid inspection please///rock; Phone #: ###-#### Internet Inspection Request from: Barbara Moore still needs to fix prem wires some areas still more than 1in6 also mec needs to fire proof at corrodor walls elec still needs to sign of lights 3/19/2004 11:16:49 AM
|
BLD-Framing/Rough-in | 3/16/2004 | 3/17/2004 | 3/17/2004 | A | FAIL |
Dave Hannah
|
|
|
rock; Phone #: ###-#### Internet Inspection Request from: Darla Downs fire proofing one hour walls and remove clips on ceiling crid 3/17/2004 9:49:56 AM
|
BLD-Framing/Rough-in | 1/20/2004 | 1/21/2004 | 1/21/2004 | A | PART |
Dave Hannah
|
|
|
###-#### DAN 1/21/2004 9:05:34 AM walked demo and reveiwed plans with dan 1/21/2004 10:11:55 AM
|