BLD-Final | 3/18/2004 | 3/19/2004 | 3/19/2004 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/18/2004 at 2:56:28 PM. Contact: ###-####. ok for perm occ 3/19/2004 1:51:24 PM
|
Permanent Occupancy | | 3/19/2004 | 3/19/2004 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/18/2004 | 3/18/2004 | 3/18/2004 | P | PASS |
Rick Jackson
|
|
|
Rated doors will be completed for structural inspector 3/18/2004 3:40:55 PM
|
BLD-Other | 3/2/2004 | 3/3/2004 | 3/3/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/2/2004 at 7:57:16 AM. Contact: ###-####. ceiling grid ok to drop in panels pods ok 3/3/2004 8:58:16 AM
|
BLD-Other | 2/25/2004 | 2/27/2004 | 2/27/2004 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/25/2004 at 9:00:38 AM. Contact: ###-####. ok to install tiles in hallwaly and perimeter check pods 2/27/2004 1:38:40 PM 2/27/2004 1:39:04 PM
|
BLD-Framing/Rough-in | 1/14/2004 | 1/15/2004 | 1/15/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/14/2004 at 12:17:11 PM. Contact: ###-####. ok to cover inter walls 1/15/2004 9:28:26 AM
|
BLD-Framing/Rough-in | 1/6/2004 | 1/7/2004 | 1/7/2004 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/6/2004 at 5:08:55 PM. Contact: ###-####.
ok to cover demising wall pending trades 1/7/2004 3:45:04 PM
|