BLD-Final | 11/29/2004 | 11/29/2004 | 11/29/2004 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 11/29/2004 at 9:50:11 AM. Contact: ###-####.
|
BLD-Grading Inspection | 11/24/2004 | 11/24/2004 | 11/24/2004 | | DONE |
|
|
|
Final grading and drainage approved.
|
BLD-Energy code compliance | 3/18/2004 | 3/18/2004 | 3/18/2004 | P | PASS |
Dave Hannah
|
|
|
JUSTIN; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 3/16/2004 | 3/16/2004 | 3/16/2004 | P | PASS |
Dave Hannah
|
|
|
JUSTIN; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok to insulate 3/16/2004 2:39:34 PM
|
BLD-Foundation | 12/19/2003 | 12/22/2003 | 12/22/2003 | P | PART |
Troy James
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Footing | 12/17/2003 | 12/18/2003 | 12/18/2003 | A | PASS |
Steven Webb
|
|
|
Ed; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Footing | 12/16/2003 | 12/17/2003 | 12/17/2003 | P | CANC |
Jim Storey
|
|
|
Ed; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Footing | 12/17/2003 | 12/17/2003 | 12/17/2003 | P | CANC |
Jim Storey
|
|
|
Justin; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Grading Inspection | 12/17/2003 | 12/17/2003 | 12/17/2003 | | PASS |
Rita DeYoung
|
|
|
the footing subgrade was conditionally approved by the geotechnical engineer. Because the entrance footing crossed one of the test pits, the engineer recommended that two additional #4 bars be placed for a minimum of two feet on either side of the test pit.
|