Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD03-02733
StatusFinaled
Name RYAN CONSTRUCTION CO INC
Site Address 4354 N HACKBERRY WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 4435 sq. ft. two story single family dwelling with a 956 sq. ft. attached three car garage, a 158 sq. ft. covered entry porch and concrete patios at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible area will be maintained. (1st floor 3161 sq. ft.)(2nd floor 1274 sq. ft.) PC #707 DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/19/200410/19/200410/19/2004PPASS
DetailsTroy James
Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
BLD-Final10/18/200410/18/200410/18/2004PFAIL
DetailsTroy James
Scheduled by a contractor via Hello! on 10/18/2004 at 9:21:37 AM. Contact: ###-####. Need plumbing final. 10/18/2004 1:12:29 PM
BLD-Final10/18/200410/18/200410/18/2004PFAIL
DetailsTroy James
Scheduled by a contractor via Hello! on 10/18/2004 at 9:21:37 AM. Contact: ###-####. Need plumbing final. 10/18/2004 1:12:29 PM
BLD-Final10/18/200410/18/200410/18/2004PFAIL
DetailsTroy James
Scheduled by a contractor via Hello! on 10/18/2004 at 9:21:37 AM. Contact: ###-####. Need plumbing final. 10/18/2004 1:12:29 PM
BLD-Grading Inspection9/30/20049/30/20049/30/2004 DONE
Final grading and drainage approved
BLD-Framing/Rough-in3/17/20043/17/20043/17/2004PPASS
DetailsTony Young
john ryan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Conference3/15/20043/16/20043/16/2004ACANC
DetailsRuss Owen
conf. w/ brian the pick-up framer . Did not need a conference. 3/15/2004 7:29:39 PM
BLD-Energy code compliance3/15/20043/15/20043/15/2004PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 3/15/2004 at 7:38:59 AM. Contact: ###-####.
energy ok,,, but still have some minor frame issues 3/15/2004 3:07:06 PM
BLD-Conference3/10/20043/11/20043/11/2004APART
DetailsTony Young
conf. w/ framer,,, mike or John ###-####
BLD-Framing/Rough-in3/9/20043/10/20043/10/2004AFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 3/9/2004 at 1:24:19 PM. Contact: ###-####.
c/n posted,, ok to insulate 3/10/2004 4:54:52 PM
BLD-Framing/Rough-in3/5/20043/8/20043/8/2004AFAIL
DetailsTony Young
john shear nail; Phone #: ###-#### Internet Inspection Request from: Darla Downs
need to nail shear where reqd., not staple, add studs on holddown area on south 3/8/2004 2:22:07 PM
BLD-Foundation12/3/200312/4/200312/4/2003APART
DetailsTony Young
brent; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Footing12/2/200312/3/200312/3/2003APART
DetailsTony Young
brent; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Grading Inspection12/3/200312/3/200312/3/2003 PASS
DetailsRita DeYoung
footing subgrade approved by the geotechnical engineer