BLD-Final | 3/22/2004 | 3/22/2004 | 3/22/2004 | P | PASS |
Jim Sly
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/C issued. 3/22/2004 4:28:43 PM
|
BLD-Energy code compliance | 2/17/2004 | 2/17/2004 | 2/17/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/17/2004 at 7:02:13 AM.
|
BLD-Framing/Rough-in | 2/13/2004 | 2/13/2004 | 2/13/2004 | P | PASS |
Jim Sly
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Footing | 1/26/2004 | 1/27/2004 | 1/27/2004 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/26/2004 at 4:43:25 PM. Contact: ###-####. Extra excavation exposed good hard ground. 1/27/2004 12:33:20 PM
|
BLD-Footing | 1/26/2004 | 1/26/2004 | 1/26/2004 | P | FAIL |
Jim Sly
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Annette Moore 1/26/2004 3:48:37 PM 3 or 4 different types of soils (fill) Will have to excavate down further. 1/26/2004 3:50:17 PM
|