BLD-Final | 4/27/2004 | 4/29/2004 | 4/29/2004 | P | PASS |
Tony Young
|
|
|
Joe; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
FIRE-Final Inspection | 4/27/2004 | 4/29/2004 | 4/29/2004 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 4/28/2004 3:21:59 PM
|
FIRE-Final Inspection | 4/27/2004 | 4/28/2004 | 4/27/2004 | A | CANC |
Troy Cobbley
|
|
|
Joe; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Inspection cancelled from web by: Aimee Hughes
|
BLD-Final | 4/27/2004 | 4/28/2004 | 4/27/2004 | A | CANC |
Tony Young
|
|
|
Joe; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Inspection cancelled from web by: Aimee Hughes
|
BLD-Framing/Rough-in | 4/20/2004 | 4/20/2004 | 4/20/2004 | P | PASS |
Tony Young
|
|
|
ceiling grid joe ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Energy code compliance | 3/25/2004 | 3/25/2004 | 3/25/2004 | P | FAIL |
Troy James
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Need to provide galvanized sleeve where B-Vents penetrates insulation at ceiling and provide 1" clearance to b-vent through sheetrock ceiling. 3/25/2004 3:12:34 PM
|
BLD-Framing/Rough-in | 3/9/2004 | 3/9/2004 | 3/9/2004 | P | PART |
Tony Young
|
|
|
Joe; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
ok to cover soffits, need RFI on change w/ ceiling,,, ALSO NEED MECHANICAL PERMIT 3/9/2004 3:25:16 PM
|
BLD-Framing/Rough-in | 3/5/2004 | 3/8/2004 | 3/8/2004 | A | FAIL |
Russ Owen
|
|
|
joe inspection for canopy; Phone #: ###-#### Internet Inspection Request from: Darla Downs. Need to seal draftstop complete, has areas with holes. need the H.2 clips on bottom of jack trusses at front some missing. contractor on site notified.3/7/2004 6:57:49 PM 3/7/2004 6:58:06 PM
|
BLD-Energy code compliance | 3/5/2004 | 3/5/2004 | 3/5/2004 | P | PART |
Tony Young
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Annette Moore
walls and bathrooms ok to cover 3/5/2004 2:48:13 PM
|
BLD-Wall cover | 3/3/2004 | 3/4/2004 | 3/4/2004 | A | PART |
Tony Young
|
|
|
Joe; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
walls ok to insulate 3/4/2004 12:41:15 PM
|
BLD-Framing/Rough-in | 2/27/2004 | 2/27/2004 | 2/27/2004 | P | PART |
Tony Young
|
|
|
shear nail wall ###-#### joe
ext. shear ok 2/27/2004 2:38:40 PM
|
BLD-Framing/Rough-in | 2/24/2004 | 2/24/2004 | 2/24/2004 | P | PART |
Troy James
|
|
|
JOE SHEAR ROOF NAIL; Phone #: ###-#### Internet Inspection Request from: Darla Downs
shear roof nail ok 2/24/2004 1:01:42 PM
|
BLD-Foundation | 2/4/2004 | 2/5/2004 | 2/5/2004 | P | PASS |
Steven Webb
|
|
|
Joe; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Foundation for existing building which had burned. 2/5/2004 6:18:02 PM
|
BLD-Footing | 2/2/2004 | 2/3/2004 | 2/3/2004 | P | PART |
Tony Young
|
|
|
Joe; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Footing | 1/30/2004 | 2/2/2004 | 2/2/2004 | A | NR |
Tony Young
|
|
|
Late morning please///JOE; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 2/2/2004 | 2/2/2004 | 2/2/2004 | P | NR |
Tony Young
|
|
|
LATE AFTERNOON ###-####
|