BLD-Final | 9/24/2004 | 9/24/2004 | 9/24/2004 | P | PASS |
Troy James
|
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Grading Inspection | 9/24/2004 | 9/24/2004 | 9/24/2004 | | BOND |
|
|
|
Grading and drainage is conditionally approved. Grading and drainage mostly complete. However, two small retaining walls must be built in the rear yard. For these the contractor has bonded to ensure satisfactory completion.
|
BLD-Final | 9/21/2004 | 9/22/2004 | 9/22/2004 | A | NR |
Tony Young
|
|
|
need hillside sign off,,, all else ok 9/22/2004 3:00:18 PM
|
BLD-Framing/Rough-in | 9/20/2004 | 9/21/2004 | 9/21/2004 | P | PART |
Tony Young
|
|
|
jim or ben; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
wanted a final,,, c/n made ok,,,, need hillside 9/22/2004 10:45:50 AM
|
BLD-Final | 9/16/2004 | 9/17/2004 | 9/17/2004 | A | FAIL |
Troy James
|
|
|
jim or ben; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
c/n posted at kitchen 9/17/2004 10:57:48 AM
|
BLD-Energy code compliance | 6/1/2004 | 6/1/2004 | 6/1/2004 | P | PASS |
Tony Young
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
recvd. letter on soils,,, waiting on other letter on approval on fix of cracked foundation,,, ok to cover upper floor and stairway area,,, floor not insulated yet. 6/1/2004 2:24:32 PM
|
BLD-Grading Inspection | 6/1/2004 | 6/1/2004 | 6/1/2004 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade approved by the geotechnical engineer
|
BLD-Energy code compliance | 5/27/2004 | 5/28/2004 | 5/28/2004 | A | FAIL |
Jim Storey
|
|
|
Mark; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes flue to close to conbustables/public works not signed off/insulation not complet. 5/28/2004 4:06:45 PM
|
BLD-Framing/Rough-in | 5/25/2004 | 5/26/2004 | 5/26/2004 | A | PART |
Tony Young
|
|
|
Ron -- please call first.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
owner will take soil report to T.Records,,, need letter of ok on front strong tie that was a fix for the cracked foundation,,, ok to insulate the upper/main floor and stairway only,,,NOTE: we are treating the unfinished basement like a crawl space. 5/26/2004 2:14:58 PM
|
BLD-Framing/Rough-in | 5/26/2004 | 5/26/2004 | 5/26/2004 | P | CANC |
Tony Young
|
|
|
Ron call 1st
|
BLD-Framing/Rough-in | 5/24/2004 | 5/24/2004 | 5/24/2004 | P | NR |
Tony Young
|
|
|
###-####- ron-- call 1st before insp
conf. only,,, need soils prior to inspection 5/24/2004 3:07:01 PM
|
BLD-Foundation | 1/19/2004 | 1/20/2004 | 1/20/2004 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 1/19/2004 at 4:05:07 PM. Contact: ###-####. Foundation/rebar per plans but no soils approval has been granted per date. Pour at own risk. 1/20/2004 9:59:51 AM
|
BLD-Footing | 1/14/2004 | 1/15/2004 | 1/15/2004 | A | PART |
Tony Young
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
ok pending soil report of pass 1/15/2004 3:22:19 PM
|