BLD-Final | 1/27/2004 | 1/28/2004 | 1/28/2004 | A | PASS |
Jim Sly
|
|
|
OK for Perm Occ. :) 1/28/2004 9:25:51 AM
|
Permanent Occupancy | | 1/27/2004 | 1/27/2004 | | DONE |
|
|
|
|
BLD-Final | 1/22/2004 | 1/22/2004 | 1/22/2004 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 1/22/2004 at 11:22:18 AM. Contact: ###-####. Ok temp oc, need 3 items for a perm, 1. door hardware at rest room,office,water heater room needs to be changed out. 2.accessible counter needs to be installed. 3.need 1-1/2" min at grab bar to water closet tank. 1/22/2004 2:20:49 PM
|
FIRE-Final Inspection | 1/22/2004 | 1/22/2004 | 1/22/2004 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety ok. Structural inspector please verify correct door hardware has been installed. Herb has the wrong type on at this time. 1/22/2004 1:44:15 PM
|
BLD-Other | 1/20/2004 | 1/20/2004 | 1/20/2004 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 1/20/2004 at 10:13:34 AM. Contact: ###-####. Ceiling grid. 1/20/2004 2:31:40 PM
|
BLD-Framing/Rough-in | 1/5/2004 | 1/5/2004 | 1/5/2004 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 1/5/2004 at 10:17:54 AM. Contact: ###-####.
|