BLD-Final | 1/19/2004 | 1/20/2004 | 1/20/2004 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/19/2004 at 3:14:40 PM. Contact: ###-####. ok for perm occ 1/20/2004 2:10:22 PM
|
FIRE-Final Inspection | 1/19/2004 | 1/20/2004 | 1/20/2004 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 1/19/2004 at 3:15:33 PM. Contact: ###-####. The fire sprinkler tamper valves are not supervised by the fire alarm panel; the GC will have them added with fire alarm submittals under BLD03-02412 1/20/2004 3:11:22 PM
|
Permanent Occupancy | | 1/20/2004 | 1/20/2004 | | DONE |
|
|
|
|
BLD-Final | 1/16/2004 | 1/16/2004 | 1/16/2004 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/16/2004 at 7:08:53 AM. Contact: ###-####.
|
FIRE-Final Inspection | 1/16/2004 | 1/16/2004 | 1/16/2004 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 1/16/2004 at 7:20:15 AM. Contact: ###-####. doors with mag hold opens require smoke detectors for door release; penetrations in three hour wall require firestopping; exit sign needed as shown on plans; door to east stair to have passage set; fire sprinklers within 6 ft of each other by west exit; smoke detector required above FACP 1/16/2004 3:01:51 PM
|
BLD-Framing/Rough-in | 12/22/2003 | 12/22/2003 | 12/22/2003 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/22/2003 at 9:46:53 AM. Contact: ###-####.
|