Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-02862
StatusFinaled
Name SHILOH DEVELOPMENT LTD CO
Site Address 4461 E TANOAK DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To build a new 2673s.f. 2-story single family dwelling with 1178s.f. on the main level; 1495s.f. on the upper level; an attached 775s.f. 2-car garage; a144s.f. covered front porch area and a144s.f. patio in the rear that has 48s.f. covered. R-1C ok per akt. "The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City." All per the approved plans as marked and the attached REScheck and plan review notes. PC# 732 pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/15/20047/15/20047/15/2004PPASS
DetailsJim Storey
or ralf at ###-####; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Final6/28/20046/29/20046/29/2004AFAIL
DetailsJim Storey
randy - call 1/2 hr before inspection for code; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles risers in garage/handrail/vapor barrior in crawl. 6/29/2004 12:27:26 PM
BLD-Final5/4/20045/6/20045/6/2004AFAIL
DetailsJim Storey
please call for access information///randy or troy at ###-####; Phone #: ###-#### Internet Inspection Request from: Barbara Moore vapor barrior in crawl/ handraills 34 38 close end/landings outside/ driveway and rough grading. 5/6/2004 10:20:16 AM
BLD-Energy code compliance2/12/20042/12/20042/12/2004PPASS
DetailsJim Storey
BLD-Framing/Rough-in2/12/20042/12/20042/12/2004PPASS
DetailsJim Storey
re-insp - ralph---###-#### c/n made ok loads aproved by truss co. 2/12/2004 3:21:02 PM
BLD-Energy code compliance2/10/20042/11/20042/11/2004PFAIL
DetailsJim Storey
ralph; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie c/n no done.no cover. 2/11/2004 3:18:01 PM
BLD-Framing/Rough-in2/9/20042/10/20042/10/2004APART
DetailsJim Storey
troy ; Phone #: ###-#### Internet Inspection Request from: Annette Moore finger joint lumber at 3 ply rafter infil used horrizontaly. justify member and load path for raffter support. trusses AG. 2/10/2004 9:04:11 AM
BLD-Framing/Rough-in2/5/20042/9/20042/9/2004ANR
DetailsJim Storey
randy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie cloned to pm wip insulattion co performing air selant aplacation. 2/9/2004 10:13:53 AM
BLD-Framing/Rough-in2/9/20042/9/20042/9/2004PCANC
DetailsJim Storey
randy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie via phone call 2/9/2004 1:18:09 PM
BLD-Foundation12/23/200312/24/200312/24/2003APASS
DetailsJim Storey
Micahel; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Footing12/18/200312/19/200312/19/2003APASS
DetailsJim Storey
Brian; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes