Permit Information
Permit NumberBLD03-02893
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMicron Building 2
Customer NumberPCS6165
ePlanReviewNo
Description
Micron Building #2 - F1 Remodel TA1 YA Relocate Hood & Etch * (PCS#20036165) To demo. and remove existing restrooms and stairway in bldg. #2 on first and second floor (1st fl. 735 sq. ft. area, 2nd fl. 635 sq. ft. area). Remodel first floor to convert the restroom and stairway areas to a new Yield Analysis Prep Lab #105A. To remodel the second floor restoom area to a new YA Electrical Test area; to infill the floor at the second floor stair area and remodel that area into a new Mechanical Room. Work includes new metal stud and gyp.bd. walls, new suspended ceiling system, installation of new air recirculating fan unit and associated ductwork, piping, lighting and electrical work. This work is being done on the first and second floors of Building #2 between grid lines A&B and 11&12. All construction per the approved plans and attached comment list. PC#745-03/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/7/20046/8/20046/8/2004PPASS
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Wayne Berry
BLD-Final5/21/20045/24/20045/24/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/21/2004 at 11:30:26 AM. Contact: ###-####. ya lab ok for occ temp. phased const. 5/27/2004 9:13:40 AM
FIRE-Final Inspection5/21/20045/24/20045/24/2004APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 5/21/2004 at 11:28:54 AM. Contact: ###-####.
FIRE-Final Inspection5/13/20045/14/20045/14/2004ANR
DetailsRick Jackson
Phone #: ###-#### Internet Inspection Request from: Wayne Berry
BLD-Conference5/6/20045/7/20045/7/2004APASS
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Wayne Berry wip ok to cover ceillings upon approval of other trades. 5/7/2004 10:51:59 AM
BLD-Conference4/23/20044/23/20044/23/2004PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/23/2004 at 7:27:54 AM. Contact: ###-####. ceilling ok 4/23/2004 2:49:47 PM
FIRE-Conference4/9/20044/12/20044/12/2004PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 4/9/2004 at 12:24:09 PM. Contact: ###-####. Met with John about need for submitting sprinkler plans 4/12/2004 2:56:20 PM
BLD-Conference4/9/20044/12/20044/9/2004PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/9/2004 at 11:03:30 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Apr 9 2004 12:17PM.
BLD-Aging Inspection4/8/20044/8/20044/8/2004 NR
DetailsJim Storey