Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD03-02904
StatusFinaled
Name J & J CONSTRUCTION
Site Address 6190 S HOLLYHOCK WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 1905 sq. ft. two story single family dwelling with a 682 sq. ft. attached three car garage, a 63 sq. ft. covered entry way and a 192 sq. ft. concrete patio at rear of structure per approved plans, all engineering/red-lining and attached condition lists. The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City. (1st floor 1663 sq. ft.)(2nd floor 242 sq. ft.) PC #747 DJO CUP #98-00132
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference5/18/20045/18/20045/18/2004PPASS
DetailsJim Storey
Jay; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Final5/18/20045/18/20045/18/2004PPASS
DetailsJim Storey
BLD-Energy code compliance2/11/20042/12/20042/12/2004APASS
DetailsJim Storey
jay ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in2/11/20042/12/20042/12/2004APASS
DetailsJim Storey
jay ; Phone #: ###-#### Internet Inspection Request from: Annette Moore c/n made ok 2/12/2004 8:55:31 AM
BLD-Framing/Rough-in2/9/20042/10/20042/10/2004APART
DetailsJim Storey
jay; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie over build above stairs ridge must be supported as a beam refur to truss engineering notes 6# and 8# for support. ok to insulate need to verify this area. 2/10/2004 9:41:09 AM
BLD-Foundation12/24/200312/26/200312/26/2003APASS
DetailsRuss Owen
###-#### jay
BLD-Foundation12/23/200312/24/200312/24/2003ACANC
DetailsJim Storey
Jay; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Foundation12/22/200312/23/200312/23/2003PPASS
DetailsJim Storey
JAY; Phone #: ###-#### Internet Inspection Request from: Darla Downs