BLD-Final | 10/8/2004 | 10/8/2004 | 10/8/2004 | P | PASS |
Lane Manuel
|
|
|
tevor pottery barn ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
ok to issue perm. c of o 10/8/2004 1:28:53 PM
|
Permanent Occupancy | | 10/8/2004 | 10/8/2004 | | DONE |
|
|
|
|
BLD-Final | 10/6/2004 | 10/7/2004 | 10/7/2004 | P | PART |
Lane Manuel
|
|
|
as late as possible please trevor; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
temp. c of o ok 10/7/2004 3:09:38 PM
|
FIRE-Final Inspection | 10/6/2004 | 10/7/2004 | 10/7/2004 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 10/7/2004 8:46:51 AM
|
BLD-Other | 9/23/2004 | 9/23/2004 | 9/23/2004 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/23/2004 at 12:55:56 AM. Contact: ###-####. Note: if possible make last inspection
gave ok to drop tile. to leave area in back of space open to see duct penetration above 9/23/2004 2:18:16 PM
|
BLD-Other | 9/21/2004 | 9/22/2004 | 9/22/2004 | P | DONE |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/21/2004 at 3:04:52 PM. Contact: ###-####.
|
FIRE-Sprinkler Rough-in | 9/7/2004 | 9/8/2004 | 9/8/2004 | P | FAIL |
Troy Cobbley
|
|
|
Contractor ment to call in a plumbing rough-in inspection 9/8/2004 3:51:56 PM
|
BLD-Framing/Rough-in | 9/3/2004 | 9/7/2004 | 9/7/2004 | A | PART |
Lane Manuel
|
|
|
trevor; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
storefront and partition walls ok. Need r-elec insp. on soffit IC lites @ storefront. 9/7/2004 12:05:09 PM
|