Permit Information
Permit NumberBLD03-03000
StatusFinaled
Name ST LUKES REG MED CNTR
Site Address 190 E BANNOCK ST
Project NameST LUKES
Customer Number 
ePlanReviewNo
Description
(ST LUKES-GROUND FLOOR) (TEMPORARY WAITING GE104 & GE105)To remodel an existing 1850 sq. ft. hospital support area for use as a temporary waiting room and future temporary equipment storage; to perform selective demolition and construct interior N.B., fire-resistive partitions to create two new fully accessivle restrooms and two waiting room areas to be surrounded by 1-hour existing corridor walls and 20 minute door assemblies at GE105 & 1-hour fire-barrier wall with 60 minute doors into corridor at GE104; upgrade electrical, mechanical, plumbing, fire suppresion and alarms systems to meet tenant needs and provide code compliance allper approved plans (part of ETA plans, BLD03-02465. This building is fully sprinklered. A "Letter of Compliance" is required for this tenant improvement as a condition of this permit. PC03-630/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection1/31/20061/31/20061/31/2006 PASS
DetailsDave Hannah
DOC - Permit Finaled1/31/20061/31/20061/31/2006PPASS
DetailsDave Hannah
BLD-Aging Inspection11/17/200511/17/200511/17/2005 PASS
DetailsTom Arcoraci
BLD-Aging Inspection4/21/20054/21/20054/28/2005 PASS
DetailsDave Hannah
mike is working on this needs plmb final
BLD-Aging Inspection8/2/20048/2/20048/2/2004 PASS
DetailsDave Hannah
BLD-Aging Inspection8/2/20048/2/20048/2/2004 PASS
DetailsDave Hannah
BLD-Final4/1/20044/1/20044/1/2004PPART
DetailsDave Hannah
Phil Doble st. lukes constr. Dave the only window I have is between 12:30 to 2:30 today I hope that won't be a problem thank's Phil; Phone #: ###-#### Internet Inspection Request from: Phil Doble 4/1/2004 2:24:46 PM needs to have plumbing sign off final install ada signage at restrooms 4/1/2004 2:28:33 PM
BLD-Final3/31/20043/31/20043/31/2004PCANC
DetailsDave Hannah
Phil Doble St. Lukes Constr. final pending on fire insp.; Phone #: ###-#### Internet Inspection Request from: Phil Doble Inspection cancelled from web by: Phil Doble
FIRE-Final Inspection3/31/20043/31/20043/31/2004PPASS
DetailsRick Jackson
There are temporary doors (20 minute) installed in corridor and is okay for this occupancy; the plans show 60 minute when this waiting room is converted to storage as indicated in next phases; 20 minute doors will be replaced in several weeks 3/31/2004 3:55:15 PM
BLD-Other3/30/20043/30/20043/30/2004PPART
DetailsDave Hannah
Phil Doble St. Lukes constr. Grid ceiling insp.; Phone #: ###-#### Internet Inspection Request from: Phil Doble Ceiling grid ok to cover 3/31/2004 8:07:29 AM
BLD-Wall cover2/18/20042/19/20042/19/2004APART
DetailsDave Hannah
St. Lukes constr. Phil Doble; Phone #: ###-#### Internet Inspection Request from: Phil Doble ok mto cover int walls 2/19/2004 11:41:56 AM