BLD-Final | 3/9/2004 | 3/9/2004 | 3/9/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/9/2004 at 6:38:04 AM. Contact: ###-####.
|
BLD-Energy code compliance | 2/18/2004 | 2/18/2004 | 2/18/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/18/2004 at 6:41:47 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/18/2004 | 2/18/2004 | 2/18/2004 | A | PASS |
Tom Arcoraci
|
|
|
NEED to check post beam conc in garage
|
BLD-Framing/Rough-in | 2/13/2004 | 2/17/2004 | 2/17/2004 | A | PART |
Russ Owen
|
|
|
steve ; Phone #: ###-#### Internet Inspection Request from: Annette Moore., Ok walls and ceiling framing, still need to put in the center support post in garage at the beam break and behind garage wall in family room 2 nd beam break approx 1 from wall , contractor on site and said he would call back for inspection of the 2 support post. 2/16/2004 7:46:38 PM
|
BLD-Footing | 1/15/2004 | 1/15/2004 | 1/15/2004 | P | PASS |
Tom Arcoraci
|
|
|
jay jones; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|