Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD03-03078
StatusFinaled
Name FLOATING FEATHER EXPRESS DAY SPA
Site Address 223 N 6TH ST Unit: 107
Project NameEAGLES CENTER-1ST FLR
Customer Number 
ePlanReviewNo
Description
(FLOATING FEATHER DAY SPA - EAGLES CENTER - 1ST FLR) This building is fire sprinklered to substitute for 1-hr fire-resistance-rated construction. To remodel an existing 2,177 square foot tenant space for use as a spa and salon. This space is located on the first story of a 4 story building. Work is to include a toilet/shower room accessible to the disabled, a toilet/shower room NOT accessible to the disabled, interior nonbearing walls, interior sliding and swinging doors, a new concrete landing and step at the Idaho Street entrance, gypsum board ceiling soffits, interior finishes, and millwork all per the approved drawings and plan review report on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection7/29/20047/29/20047/29/2004APASS
DetailsRick Jackson
Fire/life safety okay for final 7/29/2004 10:37:52 AM
Permanent Occupancy 7/29/20047/29/2004 DONE
Details
BLD-Final7/27/20047/28/20047/28/2004PPASS
DetailsDave Hannah
Martin; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok for perm occ 7/28/2004 2:06:54 PM
BLD-Final4/30/20044/30/20044/30/2004PPART
DetailsDave Hannah
martin; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok for temp occ needs fire life safty sign off and letter from bld owner on shaft 4/30/2004 4:41:56 PM
FIRE-Final Inspection4/30/20044/30/20044/30/2004PPART
DetailsRick Jackson
martin; Phone #: ###-#### Internet Inspection Request from: Annette Moore Per Dave Miller a temp occupancy has been approved pending completion of the exsisting one hour shaft with a smoke/fire damper with detection to fire alarm system 4/30/2004 3:46:21 PM
BLD-Final4/27/20044/28/20044/28/2004PFAIL
DetailsDave Hannah
Martin; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 1hr mec shaft needs tobe fixed hand rail and front door hardware 4/28/2004 4:36:19 PM
BLD-Framing/Rough-in3/4/20043/5/20043/5/2004PPASS
DetailsDave Hannah
Martin; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Wall cover2/26/20042/27/20042/27/2004PPART
DetailsDave Hannah
Martin; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok to cover steel stud infill walls 2/27/2004 3:35:56 PM