Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-00042
StatusFinaled
Name CPR CONNECTION
Site Address 391 N ANCESTOR PL Unit: 100
Project NameEMERALD TECH CENTER-BLDG F
Customer Number 
ePlanReviewNo
Description
(CPR CONNECTION)(EMERALD TECH CENTER-BLDG F-STE 100) New 5,000 sq. ft. office tenant with three large training rooms in west end of existing vacant shell building space. Work to include one new exterior exit door in former window opening, new interior walls, new interior doors and one window, interior finish, new suspended ceiling, new accessible restrooms, new fire sprinkler and alarm work, new mechanical, new plumbing, and new electrical work. A Certificate of Occupancy is to be issued when completed and approved. NOTE: Prior to a permanent Certificate of Occupancy being issued to the tenant, the shell building permit (BLD02-00699) must be finaled and approved with a Letter of Completion issued. NOTE: This building is fully fire sprinklered for area increase. (PC#019-04) JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection6/20/20066/20/20066/20/2006 DONE
DetailsMike Jordan
DOC - Permit Finaled6/20/20066/20/20066/20/2006PPASS
DetailsMike Jordan
BLD-Aging Inspection4/11/20064/11/20064/11/2006 CANC
DetailsMike Jordan
DOC - Permit Finaled4/11/20064/11/20064/11/2006PDONE
DetailsMike Jordan
BLD-Final4/23/20044/26/20044/26/2004ADONE
DetailsJim Sly
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Called in by mistake. 4/26/2004 8:14:03 AM
BLD-Final3/24/20043/25/20043/25/2004PPASS
DetailsRuss Owen
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 3/24/2004 2:46:06 PM Ok all signatures on card. 3/24/2004 10:13:24 PM 3/24/2004 10:13:28 PM
BLD-Final3/17/20043/19/20043/19/2004APART
DetailsJim Sly
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK for Temp Occ. 3/19/2004 2:07:45 PM
FIRE-Final Inspection3/18/20043/19/20043/19/2004AFAIL
DetailsTroy Cobbley
Shell fire sprinkler system forward flush test failed. 3/19/2004 9:34:10 AM
FIRE-Final Inspection3/19/20043/19/20043/19/2004PPASS
DetailsTroy Cobbley
fire life safety finaled 3/19/2004 2:58:39 PM
FIRE-Final Inspection3/17/20043/18/20043/18/2004AFAIL
DetailsTroy Cobbley
Ok to final when shell has been done 3/18/2004 9:54:29 AM
BLD-Framing/Rough-in3/15/20043/16/20043/16/2004APASS
DetailsJim Sly
JIM CELING GRID; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in2/20/20042/20/20042/20/2004PPART
DetailsRuss Owen
###-#### tim Ok to cover walls,need 1 brace at top of a wall .I marked location, on sheet A2.1 and notified contractor on site at inspection. 2/19/2004 11:27:09 PM