BLD-Final | 4/30/2004 | 5/3/2004 | 5/3/2004 | A | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/27/2004 at 9:39:29 AM. Contact: ###-####. rolled to pm. 5/3/2004 8:35:55 AM
|
BLD-Final | 5/3/2004 | 5/3/2004 | 5/3/2004 | A | PASS |
Jim Storey
|
|
|
final ok for l/c 5/3/2004 1:22:58 PM
|
BLD-Final | 4/27/2004 | 4/30/2004 | 4/30/2004 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/27/2004 at 9:39:29 AM. Contact: ###-####. rolled over to monday am left measage to inform. 4/30/2004 7:58:29 AM
|
FIRE-Final Inspection | 4/26/2004 | 4/29/2004 | 4/29/2004 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 4/26/2004 at 2:20:38 PM. Safety will add NFPA 704 diamond at door to room 4/29/2004 2:06:12 PM
|