BLD-Energy code compliance | 5/10/2004 | 5/10/2004 | 5/10/2004 | P | PASS |
Tony Young
|
|
|
preston; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 5/5/2004 | 5/6/2004 | 5/6/2004 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 5/5/2004 at 3:43:28 PM. ok to insulate. Need seal package complete. Dryer vent to be hard pipe to exterior. Tempered window right side of french door not in yet. 5/6/2004 1:03:23 PM
|
BLD-Conference | 4/13/2004 | 4/14/2004 | 4/14/2004 | A | PART |
Tony Young
|
|
|
Casey ph ###-#### or ###-####
conf. on frame issues 4/14/2004 10:33:34 AM
|
BLD-Conference | 3/18/2004 | 3/18/2004 | 3/18/2004 | P | PART |
Tony Young
|
|
|
meet with frank on propery line
building is going to the same building line as before, just putting a ftg under to meet code,, no openings on that side 3/18/2004 2:24:42 PM
|
BLD-Foundation | 3/17/2004 | 3/18/2004 | 3/18/2004 | A | PART |
Tony Young
|
|
|
frank; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ftg ok,, wip,,,,see conf. notes 3/18/2004 1:47:41 PM
|