BLD-Energy code compliance | 3/8/2004 | 3/9/2004 | 3/9/2004 | A | FAIL |
Tom Arcoraci
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore not ready did not complete the only 2 items on the c/notice 3/9/2004 8:43:33 AM
|
BLD-Energy code compliance | 3/9/2004 | 3/9/2004 | 3/9/2004 | P | PART |
Troy James
|
|
|
Ok to cover walls. Need to verify window u-factor when installed.
|
BLD-Framing/Rough-in | 3/5/2004 | 3/8/2004 | 3/8/2004 | A | PART |
Russ Owen
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore posted c/n to have mechanical inspected,also foam holes in floor of bathroom, ok to insulate with the understanding that mec is to be inspected prior to drywalling contractor at site . 3/7/2004 7:35:06 PM
|
BLD-Framing/Rough-in | 3/4/2004 | 3/5/2004 | 3/5/2004 | A | FAIL |
Dave Hannah
|
|
|
larry please call for access; Phone #: ###-#### Internet Inspection Request from: Annette Moore not ready needs nplumbing and window and ext door set 3/5/2004 11:01:53 AM
|
BLD-Foundation | 2/12/2004 | 2/13/2004 | 2/13/2004 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 2/12/2004 at 1:32:01 PM. Contact: ###-####. Ok per approved plans. 2/12/2004 7:14:45 PM
|
BLD-Footing | 2/11/2004 | 2/12/2004 | 2/12/2004 | A | PART |
Tony Young
|
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|