BLD-Final | 11/18/2004 | 11/18/2004 | 11/18/2004 | P | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 9/30/2004 | 9/30/2004 | 9/30/2004 | P | FAIL |
Troy James
|
|
|
jeff- ###-#### call 1st before insp
Conference about stairs not complying with code. Dave Hannah wrote correction notice to fix stairs. Stairs do not meet codes for winders. Not enough head room clearance because of soffit around ductwork. Risers more than 3/8" difference. Stairs where altered to meet new floor plan at bottom. Cannot comply with prexisting condition. 9/30/2004 2:18:27 PM
|
BLD-Energy code compliance | 6/25/2004 | 6/28/2004 | 6/28/2004 | A | PASS |
Troy James
|
|
|
Jeff; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 6/23/2004 | 6/24/2004 | 6/24/2004 | A | PART |
Tony Young
|
|
|
JEFF; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
ok to insulate all of upstairs,,, see Jeff for c/n,, fire block ceiling line, support roof loads, sheild b vent also get 1" clear to combustionables from vent, straps, blocking on bearing, etc 6/24/2004 2:56:46 PM
|
BLD-Energy code compliance | 3/10/2004 | 3/10/2004 | 3/10/2004 | P | PART |
Russ Owen
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Darla Downs Ok except need to insulate around the sewer room behind pocket door with pipeing exposed ,contractor on site will do this and recall. 3/9/2004 9:07:44 PM
|
BLD-Framing/Rough-in | 3/2/2004 | 3/3/2004 | 3/3/2004 | A | CANC |
Tony Young
|
|
|
basement only
|
BLD-Framing/Rough-in | 3/1/2004 | 3/3/2004 | 3/3/2004 | A | PART |
Tony Young
|
|
|
Jess; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
ok to insulate basement only after plumbing rough in 3/3/2004 3:49:27 PM
|
BLD-Footing | 3/2/2004 | 3/2/2004 | 3/2/2004 | P | PART |
Tony Young
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|