Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-00250
StatusFinaled
Name COREY BARTON HOMES
Site Address 12286 W ABRAM DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 1966 sq. ft. two story single family dwelling with a 681 sq. ft. attached three car garage, a 110 sq. ft. covered entry porch and a 100 sq. ft. concrete patio at rear of structure per approved plans and attached condition lists. The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City. (1st floor 825 sq. ft.)(2nd floor 1141 sq. ft.) PC #053 DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/28/20044/29/20044/29/2004APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 4/28/2004 at 6:54:23 PM. C/C issued. 4/29/2004 11:22:52 AM
BLD-Final4/23/20044/26/20044/26/2004PFAIL
DetailsTroy James
Todd; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
c/n posted in house on kitchen counter. 4/26/2004 3:13:55 PM
BLD-Final4/22/20044/23/20044/23/2004PNR
DetailsJim Sly
Todd; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Need F/P final 4/23/2004 1:40:41 PM
BLD-Energy code compliance3/26/20043/29/20043/29/2004APASS
DetailsJim Sly
todd ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in3/26/20043/26/20043/26/2004PPASS
DetailsTom Arcoraci
todd; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in3/25/20043/25/20043/25/2004PNR
DetailsRuss Owen
todd; Phone #: ###-#### Internet Inspection Request from: Darla Downs Posted a c/n for plans and foam seal. 3/25/2004 12:36:08 AM
BLD-Foundation3/8/20043/8/20043/8/2004PPART
DetailsJim Sly
TODD; Phone #: ###-#### Internet Inspection Request from: Darla Downs Still need to look at garage front foot/found 3/8/2004 2:31:16 PM
BLD-Foundation3/4/20043/5/20043/5/2004ACANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/4/2004 at 9:06:15 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Mar 5 2004 7:24AM.
BLD-Foundation3/5/20043/5/20043/5/2004PCANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/5/2004 at 7:26:18 AM. Contact: ###-####.
BLD-Footing3/4/20043/4/20043/4/2004PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 3/4/2004 at 9:05:54 AM. Contact: ###-####. appears ok footings re-excavated. 3/3/2004 10:38:31 PM
BLD-Foundation3/2/20043/4/20043/3/2004PCANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/2/2004 at 1:00:42 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Mar 3 2004 6:43AM.
BLD-Foundation3/2/20043/3/20043/2/2004ACANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/2/2004 at 8:06:57 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Mar 2 2004 1:00PM.
BLD-Footing3/2/20043/2/20043/2/2004PFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/2/2004 at 8:06:34 AM. Contact: ###-####. Organic material in soil. 3/2/2004 2:19:34 PM