Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD04-00259
StatusFinaled
Name STEED CONSTRUCTION
Site Address 12301 W EXPLORER DR
Project NameBRC GENESIS BLDG
Customer Number 
ePlanReviewNo
Description
(ISU - BOISE CENTER)(BRC GENESIS BLDG) To remodel and expand both the 1st and 2nd floor tenant spaces for additional classrooms and office space per approved plans. When completed the 1st floor tenant area will be 22,599 sq.ft.; the 2nd floor tenant area will be 5,303 sq.ft. Work to include selective demolition of existing partitions and construction of new partitions. This building is fully fire sprinklered for area increase any alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department. (#PC083-04) Rmh
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/3/20046/4/20046/4/2004ANR
DetailsJim Sly
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Final6/4/20046/4/20046/4/2004PPASS
DetailsJim Sly
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes OK for Perm Occ. :) 6/4/2004 4:58:35 PM
FIRE-Final Inspection6/3/20046/4/20046/4/2004APASS
DetailsRick Jackson
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
Permanent Occupancy 6/4/20046/4/2004 DONE
Details
BLD-Framing/Rough-in5/24/20045/25/20045/25/2004PPASS
DetailsJim Sly
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Final4/21/20044/22/20044/22/2004APART
DetailsTom Arcoraci
area a b c ok for occ see floor plan superintendent has for area d 4/22/2004 9:46:38 AM
BLD-Final4/20/20044/21/20044/21/2004PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 4/20/2004 at 4:53:54 PM. Contact: ###-####. Out of time I nput this back ln for am. 4/21/2004 12:20:46 AM
FIRE-Final Inspection4/20/20044/21/20044/21/2004AFAIL
DetailsTroy Cobbley
Classroom 114 and Observaton rooms are ok to occupy. Area D and access controlled egress doors need to be addressed. Second floor egress issues have been corrected. 4/21/2004 10:40:40 AM
FIRE-Final Inspection4/8/20044/9/20044/9/2004AFAIL
DetailsTroy Cobbley
Tenant areas A, B and C are complete except for items on the last correction notice which address emergency lighting, exit signs and door hardware. Area D is not ready yet 4/9/2004 8:13:28 AM
FIRE-Sprinkler Rough-in4/5/20044/5/20044/5/2004PDONE
DetailsTroy Cobbley
inspection done under FIR04-00206 4/6/2004 8:18:13 AM
BLD-Conference4/2/20044/2/20044/2/2004PDONE
DetailsTroy Cobbley
I left a correction notice for Jim with Steed Construction for approved door hardware to be provided on the west stairwell doors. Provide approved door hardware on the west side double doors in the first floor elevator lobby. Provide approved door hardware on exit doors from suite 200 (three total). Repair or replace exit signs on second floor egress corridors and first floor lobby (six total). Provide emergency lighting in second floor egress corridors and first floor lobby. 4/5/2004 11:04:41 AM
FIRE-Conference4/1/20044/1/20044/1/2004PDONE
DetailsTroy Cobbley
Contractor wanted a temporary occupancy in a one of the tenant areas. I said no due to outstanding life safety issues which included door hardware, overspaced sprinkler pendants, lack of fire extinguishers and emergency lighting in egress corridors 4/1/2004 4:28:44 PM
BLD-Framing/Rough-in3/30/20043/31/20043/31/2004PPASS
DetailsJim Sly
JIM CELING GRID; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in3/15/20043/16/20043/16/2004PPASS
DetailsJim Sly
###-#### jim ensler