BLD-Final | 6/3/2004 | 6/4/2004 | 6/4/2004 | A | NR |
Jim Sly
|
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Final | 6/4/2004 | 6/4/2004 | 6/4/2004 | P | PASS |
Jim Sly
|
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes OK for Perm Occ. :) 6/4/2004 4:58:35 PM
|
FIRE-Final Inspection | 6/3/2004 | 6/4/2004 | 6/4/2004 | A | PASS |
Rick Jackson
|
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
Permanent Occupancy | | 6/4/2004 | 6/4/2004 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 5/24/2004 | 5/25/2004 | 5/25/2004 | P | PASS |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Final | 4/21/2004 | 4/22/2004 | 4/22/2004 | A | PART |
Tom Arcoraci
|
|
|
area a b c ok for occ see floor plan superintendent has for area d 4/22/2004 9:46:38 AM
|
BLD-Final | 4/20/2004 | 4/21/2004 | 4/21/2004 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 4/20/2004 at 4:53:54 PM. Contact: ###-####. Out of time I nput this back ln for am. 4/21/2004 12:20:46 AM
|
FIRE-Final Inspection | 4/20/2004 | 4/21/2004 | 4/21/2004 | A | FAIL |
Troy Cobbley
|
|
|
Classroom 114 and Observaton rooms are ok to occupy. Area D and access controlled egress doors need to be addressed. Second floor egress issues have been corrected. 4/21/2004 10:40:40 AM
|
FIRE-Final Inspection | 4/8/2004 | 4/9/2004 | 4/9/2004 | A | FAIL |
Troy Cobbley
|
|
|
Tenant areas A, B and C are complete except for items on the last correction notice which address emergency lighting, exit signs and door hardware. Area D is not ready yet 4/9/2004 8:13:28 AM
|
FIRE-Sprinkler Rough-in | 4/5/2004 | 4/5/2004 | 4/5/2004 | P | DONE |
Troy Cobbley
|
|
|
inspection done under FIR04-00206 4/6/2004 8:18:13 AM
|
BLD-Conference | 4/2/2004 | 4/2/2004 | 4/2/2004 | P | DONE |
Troy Cobbley
|
|
|
I left a correction notice for Jim with Steed Construction for approved door hardware to be provided on the west stairwell doors. Provide approved door hardware on the west side double doors in the first floor elevator lobby. Provide approved door hardware on exit doors from suite 200 (three total). Repair or replace exit signs on second floor egress corridors and first floor lobby (six total). Provide emergency lighting in second floor egress corridors and first floor lobby. 4/5/2004 11:04:41 AM
|
FIRE-Conference | 4/1/2004 | 4/1/2004 | 4/1/2004 | P | DONE |
Troy Cobbley
|
|
|
Contractor wanted a temporary occupancy in a one of the tenant areas. I said no due to outstanding life safety issues which included door hardware, overspaced sprinkler pendants, lack of fire extinguishers and emergency lighting in egress corridors 4/1/2004 4:28:44 PM
|
BLD-Framing/Rough-in | 3/30/2004 | 3/31/2004 | 3/31/2004 | P | PASS |
Jim Sly
|
|
|
JIM CELING GRID; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 3/15/2004 | 3/16/2004 | 3/16/2004 | P | PASS |
Jim Sly
|
|
|
###-#### jim ensler
|