BLD-Final | 6/24/2004 | 6/28/2004 | 6/28/2004 | A | PASS |
Tony Young
|
|
|
calling for c/o as early as possible.; Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
|
BLD-Conference | 6/23/2004 | 6/23/2004 | 6/23/2004 | P | PART |
Tony Young
|
|
|
need gaurd rails,, hand rails, trades, etc.,,, no formal inspection made 6/23/2004 4:27:18 PM
|
BLD-Grading Inspection | 6/23/2004 | 6/23/2004 | 6/23/2004 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage approved.
|
BLD-Wall cover | 5/20/2004 | 5/21/2004 | 5/21/2004 | P | CANC |
Tony Young
|
|
|
can you call me to let me know if I neeed to have reengineered sign off on the fiberbrace home is duplicate of home below; Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
|
BLD-Wall cover | 5/13/2004 | 5/13/2004 | 5/13/2004 | A | DONE |
Tony Young
|
|
|
interior wall shear insection; Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
|
BLD-Energy code compliance | 5/6/2004 | 5/7/2004 | 5/7/2004 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
|
BLD-Framing/Rough-in | 5/4/2004 | 5/5/2004 | 5/5/2004 | A | PASS |
Tony Young
|
|
|
late a.m. if possible or early p.m. need plumbing and mechanical green tags those are scheduled for early a.m.; Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
|
BLD-Wall cover | 5/4/2004 | 5/4/2004 | 5/4/2004 | P | FAIL |
Tony Young
|
|
|
can you make time to do preliminary walk through for framing rough in; Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
need to nail shear per plan,,,, shear insp. only 5/4/2004 1:41:53 PM
|
BLD-Wall cover | 4/27/2004 | 4/28/2004 | 4/28/2004 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
|
BLD-Foundation | 3/24/2004 | 3/24/2004 | 3/24/2004 | P | PART |
Tony Young
|
|
|
wip 3/24/2004 2:53:05 PM
|
BLD-Wall cover | 3/24/2004 | 3/24/2004 | 3/24/2004 | P | NR |
Tony Young
|
|
|
Ryan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Footing | 3/18/2004 | 3/19/2004 | 3/19/2004 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/18/2004 at 4:43:23 PM. Contact: ###-####.
had to redo some ftg due to wrong elevation,, new is ok 3/19/2004 10:52:39 AM
|
BLD-Footing | 3/16/2004 | 3/17/2004 | 3/17/2004 | A | PART |
Tony Young
|
|
|
mana; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
wip 3/17/2004 9:40:17 AM
|
BLD-Grading Inspection | 3/16/2004 | 3/16/2004 | 3/16/2004 | | PASS |
Rita DeYoung
|
|
|
footing subgrade approved by geo tech engineer
|