Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD04-00342
StatusExpired
Name BOISE SCHOOL DISTRICT
Site Address 400 W FORT ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(FACILITIES & OPERATIONS-COPY SHOP)(BOISE SCHOOL DISTRICT) To create a new 1,530 sq.ft. copy shop within an existing warehouse. Work includes new inteior partitions which have double doors and two inteiror windows and new electrical service and outlets. No new lighting or HVAC is proposed. Restrooms and drinking fountain is located within the adjacent office on the site. Doors are to be equipped with accessible hardware.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection8/9/20048/9/20048/9/2004 DONE
DetailsTroy James
BLD-Final6/9/20046/9/20046/9/2004PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/9/2004 at 7:32:29 AM. Contact: ###-####. ok for perm occ 6/9/2004 1:21:27 PM
FIRE-Final Inspection6/7/20046/7/20046/7/2004PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 6/7/2004 at 8:47:42 AM. Contact: ###-####. Will have manual flush bolts removed for structural inspector 6/7/2004 3:57:41 PM
BLD-Final6/3/20046/4/20046/4/2004AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/3/2004 at 3:41:47 PM. Contact: ###-####.need fire sign off and remove flush bolts. 6/4/2004 9:06:41 AM
BLD-Framing/Rough-in3/26/20043/26/20043/26/2004PPASS
DetailsDave Hannah
building #6-dan--for ext 133 or ###-####; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie