Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-00479
StatusFinaled
Name LONE STAR DEVELOPMENT
Site Address 11513 W FAIRVIEW AVE
Project NameLONE STAR BUILDING
Customer Number 
ePlanReviewNo
Description
(VANILLA FINISH-NO TENANTS)(LONE STAR BLDG-SUITES 100, 200, 300) To finish 3 office suites for future tenants per approved plans. Suite 100 is 534 sq.ft.; Suite 102 is 500 sq.ft.; with a common area of 205 sq.ft; Suite 103 is 1,285 sq.ft.; Work will include, construction of two unisex accessible restrooms, installation of two break room counters and sinks, installation of two janitors sinks, installation of suspended ceiling system and related interior lighting, Hvac units and ducting. Miscelaneous related interior finishes. THE shell building was constructed under bld03-02433. (Pc133-04) rmh
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection6/21/20066/21/20066/21/2006 DONE
DetailsMike Jordan
DOC - Permit Finaled6/21/20066/21/20066/21/2006PPASS
DetailsMike Jordan
BLD-Aging Inspection4/13/20064/13/20064/13/2006 CANC
DetailsMike Jordan
DOC - Permit Finaled4/13/20064/13/20064/13/2006ADONE
DetailsMike Jordan
BLD-Framing/Rough-in6/14/20056/14/20056/14/2005PCANC
DetailsMike Jordan
larry Note: ceiling grid; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles//cancelled per scheduled on wrong permit per larry 6/14/05 LEM 2:38pm
FIRE-Final Inspection6/14/20056/14/20056/14/2005PCANC
DetailsTroy Cobbley
larry ; Phone #: ###-#### Wrong permit called in plus the job is not ready for inspection per Larry.
BLD-Final12/2/200412/3/200412/3/2004PPASS
DetailsLane Manuel
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
l of c ok for vanilla finish improvement units 12/3/2004 1:27:36 PM
FIRE-Final Inspection12/2/200412/3/200412/3/2004APASS
DetailsTroy Cobbley
Fire life safety finaled 12/3/2004 10:28:13 AM
FIRE-Final Inspection10/22/200410/22/200410/22/2004AFAIL
DetailsTroy Cobbley
Provide signage on corner of building showing directions to suite 102. Provide exit discharge lighting as per building review note #4. Lighting to be listed for outdoor use and have battery backup
FIRE-Final Inspection10/21/200410/21/200410/21/2004PFAIL
DetailsTroy Cobbley
Shell permit needs finaled first and verification needs to be provided verifying the hvac units move less than 2000cfm of air 10/21/2004 4:16:35 PM
BLD-Framing/Rough-in9/15/20049/16/20049/16/2004APART
DetailsJim Sly
larry; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie--ceiling grid Must be grid insp....OK. 9/17/2004 9:45:55 AM
BLD-Energy code compliance7/29/20047/30/20047/30/2004APASS
DetailsJim Storey
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore c/n made ok 7/30/2004 8:14:05 AM
BLD-Energy code compliance7/28/20047/29/20047/29/2004APART
DetailsJim Storey
Larry; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes insulation ok plumbing vents @4 locations need fire stopped at ceilling ok to cover all but these locations c/n posted/ 7/29/2004 9:41:00 AM
BLD-Energy code compliance7/28/20047/28/20047/28/2004PNR
DetailsJim Sly
larry - readdress - 11513 fairview; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in7/26/20047/26/20047/26/2004PPASS
DetailsLane Manuel
Phone #: ###-#### Internet Inspection Request from: Larry Tiernan
BLD-Conference6/21/20046/21/20046/21/2004PNH
DetailsJim Sly
Larry; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes