Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-00525
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 3000 S DENVER WAY
Project NameMicron #33
Customer Number6422
ePlanReviewNo
Description
Micron Building #33 (PCS #6422) - This project is to remodel approximately 34,150 sq. ft. of the first floor of an existing 68,180 sq. ft., two story manufacturing building. This remodel will convert the existing H-5 & B Occupancies to F-1 & B Occupancies. The second floor is office and mechanical platform space and there is no work being proposed for the second floor areas under this permit. There is a 5760 sq. ft. area at the southeast corner of the first floor that is currently occupied as Lab and Office areas, there is no remodel work proposed for this area under this permit. The remainder of the building is currently unoccupied. There is no work proposed at the accessible restrooms, break room, facilities shop and shipping and receiving areas located on the west end of the first floor. The remaining areas will have some interior partition and doors removed and relocated to create new manufacturing, testing and finished goods storage areas. There are no rated corridors required within this building. All construction per the approved plans and attached comment list. PC#141-04/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/13/20049/14/20049/14/2004APASS
DetailsJim Storey
Jim, please call me on cell (###-####)in advance so that I will have time to travel over to Bldg 33. Thx. Holmes; Phone #: ###-#### Internet Inspection Request from: Dennis Holmes
Permanent Occupancy 9/14/20049/14/2004 DONE
Details
BLD-Final9/1/20049/3/20049/2/2004ACANC
DetailsJim Storey
Jim, please call me on my cell phone (###-####) to give me heads up before you head over to Bldg. 33. This will give me time to travel over there from the main site. Thx. Dennis; Phone #: ###-#### Inspection cancelled from web by: Dennis Holmes
BLD-Final9/1/20049/2/20049/1/2004ACANC
DetailsJim Storey
Jim, please give me heads up so that I can meet you at Bldg. 33. Cell phone ###-####.; Phone #: ###-#### Internet Inspection Request from: Dennis Holmes Inspection cancelled from web by: Dennis Holmes
BLD-Final8/13/20048/16/20048/16/2004AFAIL
DetailsJim Storey
Jimbo, the plumbing and the Fire Life Safety had just been finaled, so I thought that whilest you were here, we could try and final the Building Permit.; Phone #: ###-#### Internet Inspection Request from: Dennis Holmes
FIRE-Final Inspection8/11/20048/13/20048/13/2004APASS
DetailsRick Jackson
Rick, you can contact me on my cell phone when you are ready to meet me at Bldg. 33. ###-#### Thx. Dennis; Phone #: ###-#### Internet Inspection Request from: Dennis Holmes
FIRE-Final Inspection7/19/20047/21/20047/21/2004AFAIL
DetailsRick Jackson
Phone #: ###-#### Internet Inspection Request from: Dennis Holmes Need to repair exit and add exit sign at corner of main hallway by shop office; add extinguisher as shown on plans and hang another; a slider door was added and needs thumbturn disabled and sign added indicating push to exit 7/21/2004 9:11:22 AM
FIRE-Final Inspection7/7/20047/8/20047/8/2004PFAIL
DetailsRick Jackson
cell Ph.###-####; Phone #: ###-#### Internet Inspection Request from: Daniel Buccino Need clarification of exit signage; lighting plans/exiting don't match and there are areas lacking signs; tlaked to Paul M and he has updated plans that will be brought to Dennis 7/8/2004 3:06:39 PM
BLD-Wall cover6/7/20046/8/20046/8/2004ADONE
DetailsTroy James
Scheduled by a contractor via Hello! on 6/7/2004 at 2:59:37 PM. Contact: ###-####. Interior partition walls already covered. Contractor says ok to cover per Jim Storey. Electrical inspections done. 6/8/2004 11:01:55 AM
BLD-Footing5/19/20045/20/20045/20/2004PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/19/2004 at 8:09:11 AM. Contact: ###-####.
BLD-Footing5/12/20045/14/20045/14/2004PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/12/2004 at 10:01:04 AM. Contact: ###-####.
BLD-Footing5/13/20045/14/20045/14/2004APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/13/2004 at 12:59:04 PM. Contact: ###-####.
BLD-Footing5/12/20045/13/20045/13/2004APASS
DetailsTroy James
Scheduled by a contractor via Hello! on 5/12/2004 at 10:00:43 AM. Contact: ###-####. Ok to place concrete for equipment pad N/W corner of buiding. 5/13/2004 2:51:38 PM
BLD-Footing5/12/20045/12/20045/12/2004PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/12/2004 at 10:01:55 AM. Contact: ###-####. pending si 5/12/2004 1:37:50 PM
BLD-Footing5/5/20045/7/20045/7/2004APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 5/5/2004 at 10:36:08 AM. Contact: ###-####. subject to s-i. 5/7/2004 11:51:27 AM
BLD-Footing5/5/20045/6/20045/6/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/5/2004 at 10:35:50 AM. Contact: ###-####. wip 5/6/2004 4:05:53 PM
BLD-Footing5/5/20045/5/20045/5/2004PCANC
DetailsTroy James
Scheduled by a contractor via Hello! on 5/5/2004 at 10:35:26 AM. Contact: ###-####.
BLD-Conference5/3/20045/4/20045/4/2004APART
DetailsJim Storey
dennis holmes; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need info on 1hr fire barrior/ and psi requriment for concrete for equment pad. arch to respond back. 5/4/2004 10:26:20 AM