Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD04-00570
StatusFinaled
Name 17TH FLOOR RESTROOM UPGRADE
Site Address 101 S CAPITOL BLVD
Project NameUS BANK-17TH FLR
Customer Number 
ePlanReviewNo
Description
(UNICO PROPERTIES - 17TH FLOOR RESTROOM UPGRADE - US BANK BLDG) This building is fire sprinklered because it is a high-rise. To upgrade the restrooms located on the 17th floor of an existing high-rise building to be accessible to the disabled. Selective nonstructural demolition within the restrooms is also covered under this permit. Work is to include interior nonbearing walls, relocated plumbing fixtures, and finishes all per the approved drawings and the plan review report on file. The tenant improvement work on this floor for a whole floor tenant space was covered by permit BLD03-02949. The location of fire sprinkler heads shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection4/12/20064/12/20064/14/2006 PASS
DetailsDave Hannah
wip
BLD-Final4/12/20064/12/20064/13/2006PFAIL
DetailsDave Hannah
needs ade signage at restroom doors
BLD-Aging Inspection11/22/200511/22/200511/22/2005 PASS
DetailsDave Hannah
wip
FIRE-Final Inspection4/13/20054/13/20054/13/2005PPASS
DetailsForrest France
Approved delayed egress door #'s 1703 and 1704 operated properly during inspection. This was the only item reviewed. No sign off card available on site. ; Phone #: ###-####
BLD-Aging Inspection9/3/20049/3/20049/3/2004 PASS
DetailsDave Hannah
wip 9/3/2004 8:04:12 AM
BLD-Framing/Rough-in6/8/20046/9/20046/9/2004APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/8/2004 at 2:44:43 PM. Contact: ###-####. ok to cover restrooms 6/9/2004 9:52:13 AM
BLD-Framing/Rough-in6/7/20046/7/20046/7/2004PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/7/2004 at 8:08:28 AM. Contact: ###-####.
BLD-Framing/Rough-in6/2/20046/4/20046/4/2004AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/2/2004 at 4:35:49 PM. Contact: ###-####. needs to replace outer layers of rock on mec shaft 6/4/2004 10:37:37 AM
BLD-Framing/Rough-in5/24/20045/24/20045/24/2004PNR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/24/2004 at 8:27:04 AM. Contact: ###-####. needs 2 hr fire stop at floor ceiling in bath room 5/24/2004 4:25:21 PM