Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD04-00572
StatusFinaled
Name K-J CORPORATION INC
Site Address 2717 W BANNOCK ST
Project NameTHOMAS DEVELOP-BLDG B
Customer Number 
ePlanReviewNo
Description
(POST INSURANCE SERVICES INC)(THOMAS DEVELOPMENT-BLDG B-SUITE 102) A 'certificate of occupancy' is required for this tenant in order to legally occupy this tenant space. To finish the remaining 2,506 sq. of first floor and a 1,452 sq. ft. basement as professional offices and support areas per approved plans, to include red-line notes thereon and all attached plan review comments and conditions of all reviewing agencies. Work includes construction of interior non-bearing walls to create a combination of private offices & open office areas, a reception / waiting area, conference room, work room and two fully accessible restrooms, modify existing common entry vestibule to meet accessibility compliance for clearance between double doors. To insulate exterior walls, crawl space floor and attic; install HVAC & lighting for Energy Code Compliance (IECC) with interior finishes and cabinetry to meet tenant needs and minimum code compliance. PC04-158/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/10/20049/13/20049/13/2004ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/10/2004 at 1:32:11 PM. Contact: ###-####.
BLD-Final9/13/20049/13/20049/13/2004PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/10/2004 at 1:32:11 PM. Contact: ###-####. ok for perm occ 9/13/2004 1:29:27 PM
Permanent Occupancy 9/13/20049/13/2004 DONE
Details
BLD-Final9/9/20049/10/20049/10/2004AFAIL
DetailsDave Hannah
jack; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie door hardware and closers ada restrooms e\ct 9/10/2004 2:08:07 PM
BLD-Final9/8/20049/9/20049/9/2004ANR
DetailsDave Hannah
jack; Phone #: ###-#### Internet Inspection Request from: Annette Moore
FIRE-Final Inspection9/9/20049/9/20049/9/2004PPASS
DetailsRick Jackson
jack; Phone #: ###-#### Internet Inspection Request from: Annette Moore GC will have door hardware/closures for structural inspector as they weren't completed 9/9/2004 2:36:36 PM
FIRE-Final Inspection9/8/20049/9/20049/9/2004AFAIL
DetailsRick Jackson
jack; Phone #: ###-#### Internet Inspection Request from: Annette Moore Add exit sign as shown on plans; complete door hardware and rated doors need closures and latch; need to test duct detectors for AHU shutdown; emergency/exit lights okay 9/9/2004 8:28:23 AM
BLD-Framing/Rough-in8/27/20048/27/20048/27/2004PPART
DetailsDave Hannah
rebbecca; Phone #: ###-#### Internet Inspection Request from: Annette Moore ceiling grid ok 8/27/2004 4:15:04 PM
BLD-Energy code compliance7/29/20047/30/20047/30/2004ANR
DetailsDave Hannah
jack; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Energy code compliance7/30/20047/30/20047/30/2004PPART
DetailsDave Hannah
jack; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles walls ok check ceiling at final 7/30/2004 1:09:59 PM
BLD-Framing/Rough-in7/28/20047/28/20047/28/2004PPART
DetailsDave Hannah
JACK; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok to cover int none loed brg walls still needs to insulate ext and ceiling 7/28/2004 2:06:34 PM