BLD-Final | 7/30/2004 | 7/30/2004 | 7/30/2004 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/30/2004 at 10:33:28 AM. Contact: ###-####.
|
BLD-Energy code compliance | 5/13/2004 | 5/13/2004 | 5/13/2004 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/13/2004 at 7:55:01 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/12/2004 | 5/12/2004 | 5/12/2004 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/12/2004 at 9:28:19 AM. Contact: ###-####. seal at top of fireplac chase, substiuted the 5-1/4 lam beam for steel, need the load calcs. 5/12/2004 3:02:09 PM
|
BLD-Conference | 5/10/2004 | 5/10/2004 | 5/10/2004 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/10/2004 at 10:36:27 AM. Contact: ###-####. beams ok 5/10/2004 2:50:29 PM
|
BLD-Foundation | 4/12/2004 | 4/13/2004 | 4/13/2004 | A | PASS |
Troy James
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 4/12/2004 | 4/12/2004 | 4/12/2004 | P | PASS |
Jim Storey
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|