BLD-Final | 4/7/2005 | 4/8/2005 | 4/8/2005 | A | PASS |
Jim Sly
|
|
|
andrew; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles C/C issued. 4/8/2005 11:04:58 AM
|
BLD-Other | 5/25/2004 | 5/25/2004 | 5/25/2004 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/25/2004 at 9:13:04 AM. Contact: ###-####. Needs 5/25/2004 3:19:03 PM
|
BLD-Framing/Rough-in | 4/12/2004 | 4/12/2004 | 4/12/2004 | P | PART |
Jim Sly
|
|
|
Andrew; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes OK to insulate.....Had discussion with home owner about re-framing at ductwork (ceiling) to give more headroom, and framing in furnace room with new combustion air for water heater. 4/12/2004 3:20:32 PM 4/12/2004 3:21:47 PM
|
BLD-Framing/Rough-in | 4/9/2004 | 4/9/2004 | 4/9/2004 | P | NH |
Tom Arcoraci
|
|
|
andrew; Phone #: ###-#### Internet Inspection Request from: Barbara Moore no answer on phone left message 4/9/2004 2:55:44 PM
|