BLD-Final | 8/19/2004 | 8/20/2004 | 8/20/2004 | A | PASS |
Tony Young
|
|
|
as early as possible please.all items taken care of from todays corrections; Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
c of o issued 8/20/2004 11:24:43 AM
|
BLD-Conference | 8/19/2004 | 8/19/2004 | 8/19/2004 | P | DONE |
Dave Hannah
|
|
|
Terry Records has received my final soil he said he would call and let you know; Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
|
BLD-Final | 8/19/2004 | 8/19/2004 | 8/19/2004 | P | CANC |
Dave Hannah
|
|
|
needs to reinstall main supply duct up to furnace in crawl needs to fix vent to waterheater needs to finish furnace gets blowing air into garage everything else is ok
|
BLD-Grading Inspection | 8/18/2004 | 8/18/2004 | 8/18/2004 | | DONE |
|
|
|
final grading and drainage approved
|
BLD-Final | 8/17/2004 | 8/17/2004 | 8/17/2004 | P | NR |
Tony Young
|
|
|
erby; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
need hillside sign off 8/18/2004 9:09:18 AM
|
BLD-Wall cover | 6/26/2004 | 6/28/2004 | 6/28/2004 | A | PASS |
Tony Young
|
|
|
int shear wall inspect; Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
|
BLD-Energy code compliance | 6/17/2004 | 6/18/2004 | 6/18/2004 | A | PASS |
Tony Young
|
|
|
I dont know if you need to check on this but heres the paperwork insulation good to inspect; Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
|
BLD-Framing/Rough-in | 6/16/2004 | 6/17/2004 | 6/17/2004 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
|
BLD-Framing/Rough-in | 6/15/2004 | 6/16/2004 | 6/16/2004 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
|
BLD-Framing/Rough-in | 6/14/2004 | 6/14/2004 | 6/14/2004 | P | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
c/n posted,, ok to insulate,,, stairs, temp. glass, eng. on as built,truss brace and nail 6/14/2004 3:41:03 PM
|
BLD-Wall cover | 6/9/2004 | 6/10/2004 | 6/10/2004 | A | FAIL |
Tony Young
|
|
|
approved plans in fireplace; Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
c/n posted,, nail and strap shear and brace panels per plan
re-inspection fee imposed,, $44.10,, pay prior to next inspection
6/10/2004 11:21:32 AM
|
BLD-Wall cover | 6/8/2004 | 6/8/2004 | 6/8/2004 | P | FAIL |
Tony Young
|
|
|
shear engineering located at fireplace; Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
c/n posted,, need to strap, block, nail per plan 6/8/2004 4:56:28 PM
|
BLD-Wall cover | 6/7/2004 | 6/7/2004 | 6/7/2004 | A | NR |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
n/r per Erby 6/7/2004 11:18:36 AM
|
BLD-Foundation | 5/11/2004 | 5/11/2004 | 5/11/2004 | P | PART |
Tony Young
|
|
|
Ryan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
ftgs ok also 5/11/2004 3:09:47 PM
|
BLD-Grading Inspection | 5/11/2004 | 5/11/2004 | 5/11/2004 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade approved by the geotechnical engineer
|
BLD-Footing | 5/7/2004 | 5/7/2004 | 5/7/2004 | P | FAIL |
Tony Young
|
|
|
ryan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
work per plans, but need soil report 5/10/2004 3:03:45 PM
|