BLD-Framing/Rough-in | 5/3/2004 | 5/3/2004 | 5/3/2004 | P | PASS |
Jim Storey
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Concrete | 4/22/2004 | 4/23/2004 | 4/23/2004 | A | CANC |
Troy James
|
|
|
dustin or ron ###-####; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Conference | 4/23/2004 | 4/23/2004 | 4/23/2004 | A | DONE |
Troy James
|
|
|
Informed owner to resubmit plans to determine the existing 4x10 header is capable of supporting the additional load of 4800 pounds from new lvl headers for patio, and to show what beam size is being used at gable end. Not shown on plans.
|
BLD-Footing | 4/22/2004 | 4/23/2004 | 4/23/2004 | A | PASS |
Troy James
|
|
|
dustin or ron ###-####; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
4/23/2004 10:05:36 AM
|