BLD-Final | 10/8/2004 | 10/12/2004 | 10/12/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/8/2004 at 4:29:47 PM. Contact: ###-####.
|
BLD-Final | 10/7/2004 | 10/8/2004 | 10/8/2004 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/7/2004 at 11:18:26 AM. Contact: ###-####. need to seal all interior electrical boxes on exterior walls 10/8/2004 12:08:57 PM
|
BLD-Final | 10/6/2004 | 10/7/2004 | 10/7/2004 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/6/2004 at 11:59:37 AM. Contact: ###-####. Need seal package on interior outlet boxes exterior walls. Seal hole at ceiling above range. 10/7/2004 10:33:02 AM
|
BLD-Grading Inspection | 9/30/2004 | 9/30/2004 | 9/30/2004 | | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Energy code compliance | 7/21/2004 | 7/21/2004 | 7/21/2004 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/21/2004 at 9:15:01 AM. Contact: ###-####. Still need to verify revised energy calcs 7/21/2004 3:59:51 PM
|
BLD-Energy code compliance | 7/20/2004 | 7/20/2004 | 7/20/2004 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/20/2004 at 7:21:43 AM. Contact: ###-####. Need R-15 in walls as noted on energy calcs. 7/20/2004 2:46:03 PM
|
BLD-Framing/Rough-in | 7/16/2004 | 7/16/2004 | 7/16/2004 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/16/2004 at 10:20:42 AM. Contact: ###-####. Need to complete fire blocking at garage soffit. Need calculations from engineer stating beam span is ok. 7/16/2004 12:50:11 PM
|
BLD-Framing/Rough-in | 7/15/2004 | 7/15/2004 | 7/15/2004 | P | FAIL |
Troy James
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles c/n posted on window. ok to insulate. 7/15/2004 2:12:04 PM
|
BLD-Framing/Rough-in | 7/14/2004 | 7/14/2004 | 7/14/2004 | P | NR |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/14/2004 at 10:38:17 AM. Contact: ###-####. No approved plans or truss calcs on site. No inspection 7/14/2004 2:12:06 PM 7/14/2004 2:12:21 PM
|
BLD-Framing/Rough-in | 7/6/2004 | 7/6/2004 | 7/6/2004 | P | PASS |
Troy James
|
|
|
john Sheer Nail inspect please; Phone #: ###-#### Internet Inspection Request from: Annette Moore Shear ok 7/6/2004 2:29:06 PM
|
BLD-Foundation | 5/11/2004 | 5/12/2004 | 5/12/2004 | A | PART |
Tony Young
|
|
|
brent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Foundation | 5/10/2004 | 5/11/2004 | 5/11/2004 | A | NR |
Tony Young
|
|
|
Brent; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Footing | 5/7/2004 | 5/10/2004 | 5/10/2004 | A | NR |
Tony Young
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
need soil rpt 5/10/2004 12:25:53 PM
|
BLD-Footing | 5/10/2004 | 5/10/2004 | 5/10/2004 | P | PART |
Tony Young
|
|
|
john ryan ###-####
|
BLD-Grading Inspection | 5/10/2004 | 5/10/2004 | 5/10/2004 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade approved by the geotechnical engineer
|