BLD-Final | 10/28/2004 | 10/28/2004 | 10/28/2004 | P | PASS |
Troy James
|
|
|
|
BLD-Final | 10/21/2004 | 10/22/2004 | 10/22/2004 | A | FAIL |
Troy James
|
|
|
Larry NOTE: Please contact 1/2 prior to inpsection- right at 11:00, Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
No insulation in floor. 10/22/2004 11:18:47 AM
|
BLD-Conference | 10/20/2004 | 10/20/2004 | 10/20/2004 | P | DONE |
Troy James
|
|
|
informed contractor to insulate the floor with r-25 or better as shown on energy calcs. Contractor not installing mechanical crawl ventilation. 10/20/2004 1:18:08 PM
|
BLD-Final | 10/7/2004 | 10/8/2004 | 10/8/2004 | P | FAIL |
Troy James
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Need fan installed in crawl space for ventilation requirements. 10/8/2004 2:37:55 PM
|
BLD-Final | 10/6/2004 | 10/6/2004 | 10/6/2004 | P | FAIL |
Troy James
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Need visqueen in crawl, guardrail at second level balcony, crawl ventilation to be completed. 10/6/2004 1:46:15 PM
|
BLD-Energy code compliance | 7/23/2004 | 7/23/2004 | 7/23/2004 | P | PASS |
Troy James
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 7/22/2004 | 7/22/2004 | 7/22/2004 | P | PASS |
Troy James
|
|
|
|
BLD-Framing/Rough-in | 7/21/2004 | 7/21/2004 | 7/21/2004 | P | FAIL |
Troy James
|
|
|
late afternoon please///larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Need to have truss calcs and energy seal package complete. 7/21/2004 3:01:38 PM
|
BLD-Foundation | 5/21/2004 | 5/24/2004 | 5/24/2004 | A | PART |
Tony Young
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Annette Moore
wip 5/24/2004 11:57:10 AM
|
BLD-Footing | 5/19/2004 | 5/20/2004 | 5/20/2004 | A | PASS |
Dave Hannah
|
|
|
###-#### larry
|