BLD-Final | 5/19/2004 | 5/20/2004 | 5/20/2004 | A | FAIL |
Jim Sly
|
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Cannot final W/O driveway....... Framing appears OK. 5/20/2004 12:03:53 PM
|
BLD-Framing/Rough-in | 5/11/2004 | 5/12/2004 | 5/12/2004 | A | PASS |
Jim Sly
|
|
|
Paul; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Conference | 5/4/2004 | 5/4/2004 | 5/4/2004 | P | PASS |
Jim Sly
|
|
|
check setbacks This inspection was initiated by a call to the City of Boise to Rita about setbacks. I met with the builder and setbacks appear to be OK per approved plan, and min. setback Req. from P&Z. 5mi....W Edna....L. Oxbow. 5/4/2004 1:22:22 PM
|
BLD-Footing | 4/27/2004 | 4/28/2004 | 4/28/2004 | A | PART |
Jim Sly
|
|
|
Paul; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Eng called for 18" holes in leiu of 16" (dug) and concrete around posts.......Contr to provide new stamped Eng for 16" footings.......if new eng shows concrete.....we need to verify B 4 pouring .....otherwise have Eng on site at frame. 4/28/2004 9:44:21 AM 4/28/2004 9:45:09 AM
|