BLD-Final | 8/30/2004 | 8/30/2004 | 8/30/2004 | P | PASS |
Troy James
|
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Energy code compliance | 7/15/2004 | 7/15/2004 | 7/15/2004 | A | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 7/14/2004 | 7/15/2004 | 7/15/2004 | A | PASS |
Jim Storey
|
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 7/12/2004 | 7/12/2004 | 7/12/2004 | P | FAIL |
Jim Storey
|
|
|
Jay; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes load calc. required mlb to rim/hangers over nailled hangers and not nailled hangers/holes in cantalever over 24 inches and mid span over sized. 7/12/2004 3:55:27 PM
|
BLD-Footing | 5/11/2004 | 5/12/2004 | 5/12/2004 | A | PASS |
Jim Storey
|
|
|
Jay --- around 10:00 if possible. thanks.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Foundation | 5/12/2004 | 5/12/2004 | 5/12/2004 | P | PASS |
Jim Storey
|
|
|
jay ready at 3pm please; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|