Code Occupancy Approval | 5/17/2007 | 5/17/2007 | 5/17/2007 | P | PASS |
Michael Garner
|
|
|
SITE INSPECTION COMPLETE - i REVIEWED THE APPROVED PLANS AND CONDITIONS AND HAVE FOUND THEM TO BE IN SUBSTANTIAL COMPLIANCE: I DID NOTE THE FOLLOWING CHANGES -
1. PLANS CALLED FOR A SOLID PLANTER ON THE MINI-COURTYARD BETWEEN THE CENTER BLDGS - THAT WAS CHANGED TO INDIVIDUAL VASE PLANTERS PER CONSULTATION WITH THE FIRE DEPARTMENT WHO HAD CONCERNS ABOUT ACCESS TO HOSE CONNECTIONS AND INTO THE BLDGS. THEMSELVES
2. PLANS FOR THE CENTER BLDGS CALLED FOR THREE [3] VERTICALLY STACKED WINDOWS MIRRORING THE INTERIOR STAIRWELLS - THAT HAS BEEN CHANGED TO TWO WINDOWS, WITH THE MIDDLE WINDOW REMOVED TO ACCOMODATE A REQUIRED A NECESSARY STRUCTURAL BEAM
3. ORIGINAL PLANS CALLED FOR ROUGH-HEWN [CEDAR?] SHINGLES - BLDR. INSTEAD USED HARDI-PLANK SHINGLES BECAUSE THEY ARE LONGER LASTING, EASIER TO MAINTAIN
4. THE MOST INTERIOR [CLOSEST TO CREEK] BLDGS DO NOT HAVE A STUCCO SKIRT AS THE PLANS CALLED FOR...INSTEAD THEY HAVE A STONE SKIRT WHICH IS IN KEEPING WITH THE STONE SKIRTS ON ALL THE OTHER BLDGS.
THESE CHANGES ARE ACCEPTABLE AND WITHIN THE PARAMETERS OF THE SCOPE AND INTENT OF THE APPROVED PLANS AND CONDITIONS - PASS/CASE CLOSED
|
BLD-Final | 11/28/2006 | 12/1/2006 | 12/1/2006 | A | PASS |
Tony Young
|
|
|
buddy ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Final | 11/22/2006 | 11/27/2006 | 11/27/2006 | P | PART |
Tony Young
|
|
|
buddy ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith need step in garage,, fix landing on south unit,, gave paperwork for north unit , bank purpose only
|
BLD-Framing/Rough-in | 10/3/2006 | 10/3/2006 | 10/3/2006 | P | CANC |
Tony Young
|
|
|
kell; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles cancelled per kell wrong permit
|
BLD-Energy code compliance | 9/26/2006 | 9/27/2006 | 9/27/2006 | A | PASS |
Tony Young
|
|
|
tiel; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 9/25/2006 | 9/25/2006 | 9/26/2006 | P | PART |
Dave Hannah
|
|
|
keil; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley needs to fix fire wall need to finish framing around ducts and vents sheet roc k behind tubs and shower
|
BLD-Framing/Rough-in | 9/20/2006 | 9/20/2006 | 9/21/2006 | P | NR |
Tony Young
|
|
|
kyle; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 9/19/2006 | 9/19/2006 | 9/19/2006 | P | NR |
Tony Young
|
|
|
keil; Phone #: ###-#### need trades
|
BLD-Concrete | 9/19/2006 | 9/19/2006 | 9/19/2006 | P | CANC |
Tony Young
|
|
|
keil - late afternoon if possible; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Framing/Rough-in | 9/18/2006 | 9/19/2006 | 9/19/2006 | A | NR |
Tony Young
|
|
|
kile; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles need trades 1st
|
BLD-Framing/Rough-in | 8/9/2006 | 8/9/2006 | 8/9/2006 | P | PART |
Jim Sly
|
|
|
keil - shear; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley Shear nailing, straps and holddowns at exterior only........OK.
|
BLD-Framing/Rough-in | 7/17/2006 | 7/18/2006 | 7/18/2006 | A | PART |
Tony Young
|
|
|
keil; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley 2nd floor firewall ok
|
BLD-Framing/Rough-in | 7/5/2006 | 7/5/2006 | 7/5/2006 | P | PART |
Tony Young
|
|
|
craig; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley main level firewall ok to stand
|
BLD-Foundation | 9/22/2005 | 9/22/2005 | 9/22/2005 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 9/22/2005 at 8:23:46 AM. Contact: ###-####.
|
BLD-Footing | 9/12/2005 | 9/13/2005 | 9/13/2005 | A | PASS |
Mike Jordan
|
|
|
jim ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|