Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-00941
StatusFinaled
Name HIGHLAND VILLAGE APARTMENTS
Site Address 2486 -2518 N BOGUS BASIN RD
Project NameHIGHLANDS VILLAGE BLD 6
Customer Number 
ePlanReviewNo
Description
2484& 2486 N Bogus Basin Rd & 2516 & 2518 N Bogus Basin Rd(HIGHLANDS FLOOR PLAN TYPE) To construct a new 13,266 sq.ft. three story, four unit apartment building. The first floor is 4,346 sq.ft. which 2,912 sq.ft. is for the garages, the second floor is 4,440 sq.ft. and the third floor is 4,440 sq.ft. Each unit on the second and thrird floors are single story units, three bedrooms with three bathrooms one full and two 3/4. Note: This building is fire sprinklered per NFPA 13-R for story increase. All construction per the approved plans and attached comment list. MJP DRH 02-240 CUP 02-0141
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/13/20076/14/20076/14/2007APASS
DetailsTony Young
buddy; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Final6/14/20076/14/20076/14/2007PPASS
DetailsTony Young
Buddy; Phone #: ###-####
OK FOR C OF O
Permanent Occupancy 6/14/20076/14/2007 DONE
Details
FIRE-Final Inspection6/13/20076/13/20076/13/2007PPASS
DetailsTroy Cobbley
Life safety passed.
Code Occupancy Approval5/17/20075/17/20075/17/2007PPASS
DetailsMichael Garner
SITE INSPECTION COMPLETE - i REVIEWED THE APPROVED PLANS AND CONDITIONS AND HAVE FOUND THEM TO BE IN SUBSTANTIAL COMPLIANCE: I DID NOTE THE FOLLOWING CHANGES -

1. PLANS CALLED FOR A SOLID PLANTER ON THE MINI-COURTYARD BETWEEN THE CENTER BLDGS - THAT WAS CHANGED TO INDIVIDUAL VASE PLANTERS PER CONSULTATION WITH THE FIRE DEPARTMENT WHO HAD CONCERNS ABOUT ACCESS TO HOSE CONNECTIONS AND INTO THE BLDGS. THEMSELVES

2. PLANS FOR THE CENTER BLDGS CALLED FOR THREE [3] VERTICALLY STACKED WINDOWS MIRRORING THE INTERIOR STAIRWELLS - THAT HAS BEEN CHANGED TO TWO WINDOWS, WITH THE MIDDLE WINDOW REMOVED TO ACCOMODATE A REQUIRED A NECESSARY STRUCTURAL BEAM

3. ORIGINAL PLANS CALLED FOR ROUGH-HEWN [CEDAR?] SHINGLES - BLDR. INSTEAD USED HARDI-PLANK SHINGLES BECAUSE THEY ARE LONGER LASTING, EASIER TO MAINTAIN

4. THE MOST INTERIOR [CLOSEST TO CREEK] BLDGS DO NOT HAVE A STUCCO SKIRT AS THE PLANS CALLED FOR...INSTEAD THEY HAVE A STONE SKIRT WHICH IS IN KEEPING WITH THE STONE SKIRTS ON ALL THE OTHER BLDGS.

THESE CHANGES ARE ACCEPTABLE AND WITHIN THE PARAMETERS OF THE SCOPE AND INTENT OF THE APPROVED PLANS AND CONDITIONS - PASS/CASE CLOSED
BLD-Aging Inspection4/20/20074/20/20074/27/2007 PASS
DetailsTony Young
BLD-Energy code compliance2/14/20072/15/20072/15/2007APASS
DetailsTony Young
keil; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
ok pending sprinkler cover note in computor system
FIRE-Sprinkler Rough-in2/14/20072/15/20072/15/2007ADEFR
DetailsForrest France
Inspection to be completed by B. Johnson.
FIRE-Sprinkler Rough-in2/14/20072/14/20072/15/2007PCANC
DetailsTroy Cobbley
There was no time for inspection. Will need to reschedule
BLD-Energy code compliance2/14/20072/14/20072/14/2007PFAIL
DetailsTony Young
keil; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
need sprinklers signed off,, fireblocking and int. shear finished
BLD-Framing/Rough-in2/9/20072/12/20072/12/2007APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 2/9/2007 at 3:24:50 PM. Contact: ###-####.
BLD-Framing/Rough-in2/6/20072/9/20072/9/2007PNR
DetailsTony Young
Buddy ; Phone #: ###-#### Internet Inspection Request from: Darla Downs
conf only, need to get permits grouped, need trades R /I, etc.
BLD-Aging Inspection1/30/20071/30/20072/2/2007 PASS
DetailsTony Young
BLD-Other11/30/200611/30/200611/30/2006PPASS
DetailsTony Young
buddy - note: shear ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
exterior shear ok
BLD-Other11/17/200611/20/200611/20/2006AFAIL
DetailsTony Young
buddy Note: shear; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
re nail shear
BLD-Aging Inspection10/17/200610/17/200610/20/2006 PASS
DetailsTony Young
BLD-Foundation8/16/20068/17/20068/17/2006APASS
DetailsDave Hannah
keill; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing8/9/20068/9/20068/9/2006PPASS
DetailsJim Sly
keil - pour at 2 pm; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
I verified UFER ground installed (30')
BLD-Framing/Rough-in8/9/20068/9/20068/9/2006PCANC
DetailsTony Young
keil - shear; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Aging Inspection6/15/20066/15/20066/16/2006 PASS
DetailsTony Young
BLD-Conference3/28/20063/29/20063/29/2006PPART
DetailsTony Young
keil ###-####
conf on new way to frame into firewall,, need to get architect approval,, to put 5/8" rock behind joists and hangers
BLD-Conference3/28/20063/28/20063/28/2006PPASS
DetailsTony Young
Keil, find status of permit; Phone #: ###-####
ok to keep going
BLD-Aging Inspection3/28/20063/28/20063/28/2006 PASS
DetailsTony Young
BLD-Aging Inspection1/24/20061/24/20061/24/2006 PASS
DetailsTony Young
BLD-Aging Inspection5/16/20055/16/20055/16/2005 PASS
DetailsTony Young