Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD04-00946
StatusFinaled
Name HIGHLAND VILLAGE APARTMENTS
Site Address 2468- 2474 N BOGUS BASIN RD
Project NameHIGHLANDS VILLAGE BLD 11
Customer Number 
ePlanReviewNo
Description
2468 & 2470 N Bogus Basin Rd & 2472 & 2474 N Bogus Basin Rd(HARRISON FLOOR PLAN TYPE) To construct a new 10,716 sq.ft. three story, four unit apartment building. The first floor is 3,806 sq.ft. which 2,000 sq.ft. is for the garages, the second floor is 3,946 sq.ft. and the third floor is 2,964 sq.ft. Three units are three bedroom and three and one half baths, one unit is four bedroom and three and one half baths. Note: This building is fire sprinklered per NFPA 13-R. Buildings 11 & 12 meet IBC Section 704.3 for one building and are within the aggregate area. All construction per the approved plans and attached comment list.MJP DRH 02-240 CUP 02-0141
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval5/17/20075/17/20075/17/2007PPASS
DetailsMichael Garner
SITE INSPECTION COMPLETE - i REVIEWED THE APPROVED PLANS AND CONDITIONS AND HAVE FOUND THEM TO BE IN SUBSTANTIAL COMPLIANCE: I DID NOTE THE FOLLOWING CHANGES -

1. PLANS CALLED FOR A SOLID PLANTER ON THE MINI-COURTYARD BETWEEN THE CENTER BLDGS - THAT WAS CHANGED TO INDIVIDUAL VASE PLANTERS PER CONSULTATION WITH THE FIRE DEPARTMENT WHO HAD CONCERNS ABOUT ACCESS TO HOSE CONNECTIONS AND INTO THE BLDGS. THEMSELVES

2. PLANS FOR THE CENTER BLDGS CALLED FOR THREE [3] VERTICALLY STACKED WINDOWS MIRRORING THE INTERIOR STAIRWELLS - THAT HAS BEEN CHANGED TO TWO WINDOWS, WITH THE MIDDLE WINDOW REMOVED TO ACCOMODATE A REQUIRED A NECESSARY STRUCTURAL BEAM

3. ORIGINAL PLANS CALLED FOR ROUGH-HEWN [CEDAR?] SHINGLES - BLDR. INSTEAD USED HARDI-PLANK SHINGLES BECAUSE THEY ARE LONGER LASTING, EASIER TO MAINTAIN

4. THE MOST INTERIOR [CLOSEST TO CREEK] BLDGS DO NOT HAVE A STUCCO SKIRT AS THE PLANS CALLED FOR...INSTEAD THEY HAVE A STONE SKIRT WHICH IS IN KEEPING WITH THE STONE SKIRTS ON ALL THE OTHER BLDGS.

THESE CHANGES ARE ACCEPTABLE AND WITHIN THE PARAMETERS OF THE SCOPE AND INTENT OF THE APPROVED PLANS AND CONDITIONS - PASS/CASE CLOSED
Permanent Occupancy 5/17/20075/17/2007 DONE
Details
BLD-Final4/10/20074/10/20074/10/2007PPASS
DetailsTony Young
Buddy; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
ok for perm c of o
BLD-Final3/21/20073/22/20073/22/2007APASS
DetailsTony Young
buddy; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
ok for perm occ.,, signed temp occ only because code enforcement is only temp,, but all is good,, landscape is done around this building
FIRE-Final Inspection3/20/20073/21/20073/21/2007APASS
DetailsForrest France
Fire life safety final inspection passed.
BLD-Aging Inspection12/22/200612/22/200612/26/2006 PASS
DetailsTony Young
FIRE-Conference10/5/200610/5/200610/6/2006PPASS
DetailsTroy Cobbley
Third floor sprinkler piping is ok to cover
BLD-Energy code compliance10/5/200610/5/200610/5/2006PPASS
DetailsJim Sly
Keil; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Energy code compliance10/3/200610/4/200610/4/2006ANR
DetailsDave Hannah
Keil; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Framing/Rough-in10/3/200610/3/200610/3/2006PPART
DetailsDave Hannah
kell; Phone #: ###-#### insulation ok on units a and b ok to cover
BLD-Framing/Rough-in9/28/20069/28/20069/29/2006PPASS
DetailsDave Hannah
keil; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to insulate
BLD-Framing/Rough-in9/26/20069/26/20069/26/2006PNR
DetailsDave Hannah
keil - call prior to insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Framing/Rough-in9/18/20069/18/20069/18/2006PFAIL
DetailsDave Hannah
kile; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles c/n on site
BLD-Framing/Rough-in8/10/20068/11/20068/11/2006PPART
DetailsTony Young
keil--fire wall insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
wip on exterior sheet rock over o s b, for proximity to other building
BLD-Framing/Rough-in8/9/20068/9/20068/9/2006PPART
DetailsJim Sly
keil - shear; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
Shear nailing, straps and holddowns at exterior only.......OK
BLD-Framing/Rough-in6/13/20066/13/20066/13/2006PPART
DetailsTony Young
Keil; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
attic f/w ok to place
BLD-Framing/Rough-in6/2/20066/2/20066/2/2006PCANC
DetailsTony Young
Keil; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Wall cover6/1/20066/1/20066/1/2006PPART
DetailsTony Young
keil, firewalls, 3rd level
ok to stand
BLD-Framing/Rough-in5/31/20066/1/20066/1/2006ANR
DetailsTony Young
PARTY WALL AFTER 10:00; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD-Framing/Rough-in5/15/20065/16/20065/16/2006ACANC
DetailsTony Young
keele - Note: party walls; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in5/9/20065/10/20065/10/2006APART
DetailsTony Young
party wall; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
2nd floor ok
BLD-Framing/Rough-in5/1/20065/2/20065/2/2006APART
DetailsTony Young
Keil phone# ###-####,, party wall floor joists
ok
BLD-Framing/Rough-in5/1/20065/1/20065/1/2006PPART
DetailsTony Young
craig; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
conf. only on party wall
BLD-Framing/Rough-in4/11/20064/11/20064/11/2006PPART
DetailsTony Young
Keil -- prefer 2:30PM - 3PM; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
other firewalls on main level ok
BLD-Framing/Rough-in4/10/20064/10/20064/10/2006PPART
DetailsTony Young
teal; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
N/West lower level f/wall ok
BLD-Aging Inspection4/4/20064/4/20064/4/2006 PASS
DetailsTony Young
work to begin soon
BLD-Conference2/1/20062/2/20062/2/2006APASS
DetailsTony Young
call Kiel first to see status of job
BLD-Aging Inspection2/1/20062/1/20062/2/2006 PASS
DetailsTony Young
BLD-Footing5/12/20055/13/20055/13/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 5/12/2005 at 10:52:38 AM. Contact: ###-####.
stem walls ok 5/13/2005 11:03:05 AM
BLD-Foundation5/11/20055/11/20055/11/2005PPART
DetailsDave Hannah
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa stair towers ok to pour
BLD-Foundation5/10/20055/11/20055/11/2005ACANC
DetailsTony Young
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Footing5/2/20055/3/20055/3/2005APART
DetailsTony Young
jim ###-####
wip 5/3/2005 12:31:48 PM
BLD-Footing4/29/20055/2/20055/2/2005PCANC
DetailsTony Young
jim ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa///cancel per Jim Williams 5/2/05 10:47am BAS