BLD-Final | 8/3/2004 | 8/4/2004 | 8/4/2004 | A | PASS |
Dave Hannah
|
|
|
dean; Phone #: ###-#### Internet Inspection Request from: Annette Moore this duplex is as per plans note the basement area can only be used as storage ceiling heights are to low no smoke detectors egress out one door . mec is in space. 8/4/2004 9:14:24 AM
|
BLD-Framing/Rough-in | 6/7/2004 | 6/8/2004 | 6/8/2004 | A | PASS |
Dave Hannah
|
|
|
###-#### dean ok to finish nailing fr ceiling ok otherc/n items complete 6/8/2004 3:08:42 PM
|
BLD-Framing/Rough-in | 6/7/2004 | 6/7/2004 | 6/7/2004 | P | CANC |
Dave Hannah
|
|
|
dean; Phone #: ###-#### Internet Inspection Request from: Barbara Moore///cancel per Dean and changed to 6/8/04 AM
|
BLD-Wall cover | 6/3/2004 | 6/4/2004 | 6/4/2004 | A | FAIL |
Jim Storey
|
|
|
dean; Phone #: ###-#### Internet Inspection Request from: Annette Moore need aprovals from planreview. 6/4/2004 8:27:10 AM
|
BLD-Conference | 6/3/2004 | 6/3/2004 | 6/3/2004 | P | FAIL |
Troy James
|
|
|
Informed contractor that 5/8 rock on ceiling does not meet a 1 hour assembly for duplex seperation. Told contractor to take plans back to plan review.
|
BLD-Other | 5/27/2004 | 5/28/2004 | 5/28/2004 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 5/27/2004 at 4:31:48 PM. Need to fireblock at bathroom ceilings. Install smoke detectors in hallway and bedrooms. Need to install header at floor joists in basement due to the plumber cutting floor joists out. 5/28/2004 10:38:15 AM
|
BLD-Framing/Rough-in | 5/26/2004 | 5/27/2004 | 5/27/2004 | A | PART |
Tony Young
|
|
|
dean; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 5/27/2004 | 5/27/2004 | 5/27/2004 | A | NR |
Russ Owen
|
|
|
This needs a mechanical work completed and inspected, verbally informed 2 people working at the site. NO INSPECTION PERFORMED THIS DAY. 5/27/2004 11:42:11 AM
|