BLD-Final | 3/31/2005 | 4/1/2005 | 4/1/2005 | A | PASS |
Tony Young
|
|
|
ben ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Final | 3/30/2005 | 3/31/2005 | 3/31/2005 | A | DONE |
Tony Young
|
|
|
ben ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Grading Inspection | 3/31/2005 | 3/31/2005 | 3/31/2005 | | BOND |
|
|
|
THE GRADING PLAN WAS REVISED WITHOUT PREVIOUS APPROVAL. THE CONTRACTOR HAS SUBMITTED A BOND TO ENSURE THAT THE GRADING WILL BE DONE AS APPROVED OR A REVISED PLAN WILL BE SUBMITTED AND APPROVED.
THEREFORE THE GRADING AND DRAINAGE IS CONDITIONALLY APPROVED
|
BLD-Wall cover | 12/29/2004 | 12/29/2004 | 12/29/2004 | P | PASS |
Tony Young
|
|
|
interior shear wall inspection; Phone #: ###-#### Internet Inspection Request from: Ben Bade
|
BLD-Framing/Rough-in | 12/21/2004 | 12/22/2004 | 12/22/2004 | A | PART |
Tony Young
|
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
need int shear later,,, ok to cover 12/22/2004 10:23:00 AM
|
BLD-Framing/Rough-in | 12/17/2004 | 12/20/2004 | 12/20/2004 | A | FAIL |
Troy James
|
|
|
Ben; Phone #: ###-#### Internet Inspection Request from: Jan Rice
c/n posted ok to insulate 12/20/2004 10:06:34 AM
|
BLD-Framing/Rough-in | 11/24/2004 | 11/26/2004 | 11/26/2004 | A | PART |
Tony Young
|
|
|
shear nailer \\###-####
exterior ok only,,, verify added hd at frame and interior shear later 11/26/2004 10:26:45 AM
|
BLD-Conference | 9/20/2004 | 9/20/2004 | 9/20/2004 | P | PART |
Tony Young
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
stem walls ,,,, wip 9/20/2004 3:46:53 PM
|
BLD-Footing | 8/31/2004 | 9/1/2004 | 9/1/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 8/31/2004 at 4:34:53 PM. Contact: ###-####.
|
BLD-Grading Inspection | 8/27/2004 | 8/27/2004 | 8/27/2004 | | DONE |
|
|
|
Footing subgrade for basement has been approved by the geotechnical engineer
|